Laserfiche WebLink
Natalie Lawson, Professional Positions Held <br /> M.A., RPA Cultural Resources Specialist,Present <br /> Cultural Resources Junior Cultural Resources Manager, 2004-2008 <br /> Specialist Archaeology Technician,2002-2004 <br /> CH21VI HILL Santa Ana, <br /> California Graduate Assistant,Anthropology Department, California <br /> State University,Fullerton, California,2002-2003. <br /> 3 Hutton Centre Drive, Suite 200 <br /> Office: 714-635-6179 Project Experience prior to CH21VI HILL <br /> Fax: 714-424-2246 Mid County Parkway, Riverside County, CA. Client: <br /> Riverside County Transportation Commission,Riverside, <br /> Education CA. April 2004 to February 2008. Ms. Lawson assisted with <br /> California State University, the cultural resources technical studies,the preparation of <br /> Fullerton,California,M.A., cultural resources component of EIR/EIS,and the <br /> Anthropology preparation of 4f documentation for the proposed 51 km <br /> long Mid-County Parkway located in western Riverside <br /> Arizona State University, County, California,which is located in Caltrans District 8. <br /> Tempe,Arizona,B.S., FHWA is the lead agency. Ms. Lawson functioned as Lead <br /> Chemistry Archaeological Surveyor for this project and was involved <br /> in fieldwork for the Phase I survey, the Extended Phase I <br /> Professional survey,and the Phase II Evaluation and has been an author <br /> Registrations on the following documents for this project: ASR,XPI <br /> Registered Professional proposal,XPI Supplemental Proposal,XPI report,HRER, <br /> Archaeologist (RPA) AEP,and AER. All documents were prepared according to <br /> the Caltrans Standard Environmental Reference handbook. <br /> Meets Secretary of Interior Ms. Lawson also assisted in the preparation of all site <br /> Professional Qualification records for the 100+sites included in these reports,the <br /> Standards (36CFR61) evaluation of the historic archaeological resources for the <br /> HRER,and conducted the lithics analysis for the Phase Il <br /> Evaluation. <br /> Colorado Lagoon,Long Beach, CA. Client: City of Long <br /> Beach, Long Beach, CA. December 2007. Ms. Lawson <br /> conducted a Phase I survey of 10 acres and is the primary <br /> author of final letter report. <br /> Copper Mountain Verizon Wireless,Twenty-nine Palms, <br /> CA. Client: Verizon Wireless,San Diego, CA. October 2007. <br /> Ms. Lawson visited a proposed location for cell tower <br /> upgrades and wrote a site report for proposed impacts. <br />