My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laguna Canyon Road Widening Mitigation, Orange County, <br /> CA. Client: Caltrans District 12,Irvine, CA. October 2005, <br /> September 2006,and September 2007. Ms. Lawson served as <br /> Field Director and Field Crew, assisting with the cultural <br /> resource management for the widening of Laguna Canyon <br /> Road and subsequent biological mitigation within <br /> prehistoric site CA-ORA-1055.This project is located in <br /> Caltrans District 12. As field director, Ms. Lawson oversaw <br /> unit excavation,feature excavation,and assisted with the <br /> monitoring of controlled grading,as well as in the definition <br /> of a burial discovered during construction monitoring. <br /> Additionally,Ms. Lawson conducted analysis of a portion of <br /> the flaked stone tools recovered during the monitoring and <br /> recovery phases of this project and assisted in the <br /> preparation of the final report. <br /> Beaumont Sports Park,Beaumont,CA. May 2007. Client: <br /> Urban Logic Consultants,Temecula, CA. Ms. Lawson <br /> served as Field Director for a CEQA Phase I survey of 20 <br /> acres and is the primary author of final report. <br /> 3033 Huntington Drive Project,Pasadena,CA. April 2007. <br /> Ms. Lawson served as Field Crew for additional data <br /> recovery at a small Late Prehistoric site during monitoring. <br /> Beaumont Bike Path,Beaumont, CA. April 2007. Client: <br /> Urban Logic Consultants,Temecula, CA. Ms. Lawson <br /> served as Field Crew for additional survey of an <br /> approximately 10 mile proposed bike path. <br /> Forest Lawn,Hollywood Hills,Los Angeles, CA.December <br /> 2006 and January 2007. Client: Forest Lawn,Memorial Park <br /> and Mortuary,Glendale, CA. Ms. Lawson served as Crew <br /> Chief. Duties included survey,site recordation of a single <br /> historic site,and extensive archival research of the history of <br /> the Forest Lawn-Hollywood Hills property. Ms. Lawson is <br /> the primary author of the final Section 106 report. <br /> Wildomar Recycling Master Plan,Lake Elsinore, CA. Client: <br /> City of Lake Elsinore,Lake Elsinore, CA. Ms. Lawson <br /> provided cultural resource management for a proposed <br /> recycled water pipeline,conducted the record search,the <br /> archival research, and the Native American consultation for <br /> the project,and presented final recommendations for further <br /> work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.