My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern California Edison,Sky Forest, CA.June 2004. Ms. <br /> Lawson served as Crew Chief for this project. Client: <br /> Southern California Edison. Ms. Lawson was responsible for <br /> the literature search and the Section 106 Phase I survey of a <br /> power line which was damaged during the Waterman <br /> Canyon wildfire. Additionally,one historic road was <br /> recorded. <br /> Cajalco-Ramona Corridor,Riverside County, CA. May 2004. <br /> Client: Riverside County Transportation Commission, <br /> Riverside, CA. This survey spanned 3 weeks. Ms. Lawson <br /> served as Field Director for the Section 106 Phase I survey of <br /> 10 mile section of a proposed transportation corridor. Ms. <br /> Lawson was responsible for directing the field survey. <br /> Rancho Bella Vista,Riverside County, CA.July 2004 to <br /> September 2004. Client: Centex Homes, Corona,CA. Ms. <br /> Lawson served as Lab Director for this project and <br /> conducted the artifact analysis of collections recovered at <br /> three sites during construction monitoring. She is the <br /> primary author on the final report. <br /> Murrieta Springs (Tract Map Number 29707),Murrieta,CA. <br /> September 2004 to October 2004. Client: Lennar Homes of <br /> California, Corona, CA. Ms. Lawson served as Lab Director <br /> for this project.She prepared site records for a newly <br /> recorded site discovered during construction monitoring, <br /> conducted artifact analysis of the collection from this new <br /> site, and assisted in preparation of final report. <br /> Oak Valley Specific Plan 1 Amendment,Beaumont, CA. <br /> March 2004 through July 2004. Client: SunCal Companies, <br /> Calimesa, CA. Ms. Lawson served as Field Director for the <br /> CEQA survey of this 2,600 acre project. She was responsible <br /> for directing the field survey, assisted with the recordation <br /> of the historic architectural resources, and was the primary <br /> author of the final report. <br /> Xavier College Preparatory High School,Thousand Palms, <br /> CA. March 2004. Client: Richards,Mueting and Wilkes, Inc., <br /> Riverside, CA. Ms. Lawson served as Field Director for the <br /> CEQA Phase I survey of 100 acres and assisted in the <br /> preparation of the final report. <br /> French Valley Assemblage,Menifee, CA. February 2004. <br /> Client: Beazer Homes,Menifee, CA. Ms. Lawson served as <br />
The URL can be used to link to this page
Your browser does not support the video tag.