My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was responsible for directing field excavations,including <br /> 1x1 m test units, shovel test pits,mechanical trenching, and <br /> surface collection,conducting artifact analysis,and was the <br /> primary author of the final report. <br /> Limonite Senior Project,Pedley, CA. October 2004 and <br /> November 2004. Client: Fidelity Homes,Riverside,CA. Ms. <br /> Lawson served as Field Director for the CEQA Phase I <br /> survey of 30 acres. She also updated the site record for a <br /> previously recorded resource recommended to the <br /> California Register and was the primary author of final <br /> report. <br /> The Ranch at Point Mugu,Oxnard, CA. September 2004 and <br /> October 2004. Client: Dr. Colleen Delaney-Rivera,Moorpark <br /> College,Moorpark, CA. Ms. Lawson served as Field Crew <br /> for the survey of a small ranch. Two prehistoric sites were <br /> recorded and Phase II testing,consisting only of shovel test <br /> pits,was conducted at the one of these sites. <br /> McSweeny Farm Project,Hemet, CA. May 2004 through July <br /> 2004,February 2005. Client: Suncal Development Co.,Irvine, <br /> CA. Ms. Lawson served as Field Director. The project <br /> consisted of the Section 106 Phase II evaluations for 14 sites, <br /> including prehistoric milling sites,one prehistoric habitation <br /> site, and historic refuse dumps. Ms. Lawson was responsible <br /> for overseeing unit excavation, shovel test pits,auger <br /> testing. She also monitored mechanical trenching within site <br /> boundaries. <br /> Stoneridge Estates,Moreno Valley, CA. August 2004. Client: <br /> Beazer Homes,Menifee, CA. Ms. Lawson served as Field <br /> Crew for this survey of approximately 300 acres and the <br /> recordation of 12 prehistoric sites. She was an author on the <br /> final report. <br /> Gibbel Estates Project,80 Acres,Hemet, CA. August 2004 <br /> and October 2004. Client:Woodward Interests,Murrieta, <br /> CA. Ms. Lawson served as Field Director for the CEQA <br /> survey of 80 acres,the recordation of one new prehistoric <br /> site, and the Phase II evaluations of new site and one <br /> previously recorded site located within the project. This <br /> previously recorded site was recommended eligible to the <br /> California Register. Ms. Lawson was the primary author on <br /> final report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.