My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT L:CONSTRUCTION PROCEDURES <br /> The LEC-1 well will be constructed using the following casing and cementing program: <br /> • From 0 to 30 feet bgs set 16-inch nominal diameter carbon steel conductor pipe in <br /> 18-inch-diameter borehole, and cement in place with Portland type"G" cement. <br /> • From 0 to 610 feet depth, set 10 3/4-inch nominal diameter,40.5 pounds per foot, <br /> American Petroleum Institute (API) grade K-55,short thread couplings (ST&C),casing <br /> through conductor pipe and into a 14 3/4-inch diameter borehole from 30 feet to <br /> 610 feet, and cement in place with approximately 395 cubic feet of type"G" cement. <br /> Contractor will make recommendations on specifics of the cementing program at time of <br /> construction,including recommending specific additives such as calcium chloride, gel, <br /> fly ash, or Field Processing System (FPS) to control cement hydration time,bonding <br /> ability, or shrinkage. <br /> • From 0 to 3660 feet depth,set 7-inchnominal diameter,20 pounds per foot, grade K-55 <br /> ST&C casing through 10 3/4-inch casing and into 9-7/8-inch borehole from 610 feet to <br /> 3,660 feet,and cement in place with approximately 1,650 cubic feet of type"G" cement <br /> with sufficient additives to control hydration,bonding and shrinkage. <br /> • From 3,360 to 4,575 feet depth, set 4-1/2-inch nominal diameter,15 pounds per foot, <br /> grade K-55,ST&C liner through 7-inch casing to 3,660 feet and into 61/4-inch diameter <br /> borehole from 3,660 feet to 4,575 feet,and cement with 190 cubic feet type"G" cement. <br /> Logging Procedures <br /> Logs in Surface (7-inch) Casing Interval <br /> A commercial geophysical wireline logging company will be contracted to perform a "Dual <br /> Induction Compensated Density Dual Spaced Neutron Log," including Gamma Ray, <br /> Caliper, and Spontaneous Potential tracks,throughout the interval between the shoe of the <br /> 10 3/4-inch casing at 610 feet and the bottom of the 9-7/8-inch borehole at 3,660 feet. Copies <br /> of the log at scales of 2 inches=100 feet and 5 inches=100 feet will be submitted upon <br /> completion of the well construction. <br /> After the 7-inch casing is run and cemented,a Neutron Casing Collar and Cement Bond Log <br /> will be run from 3,660 feet to 0 feet. A copy of that log at a scale of 5 inches=100 feet will be <br /> submitted upon completion of the well construction. <br /> Logs in Deep (4-112-inch) Liner Interval <br /> A "Dual Induction Compensated Density Dual Spaced Neutron Log," including Gamma <br /> Ray, Caliper, and Spontaneous Potential tracks,will be run throughout the interval between <br /> the shoe of the 7-inch casing at 3,660 feet and the bottom of the hole at 4,575 feet. Copies of <br /> that log at scales of 2 inches=100 feet and 5 inches=100 feet will be submitted upon <br /> completion of the well construction. <br /> Completion Logging <br /> Upon completion of the well construction—and as part of the initial injectivity testing of the <br /> well,temperature,pressure,and spinner flow meter—logging of the well will be performed <br /> L-2 SAC1371322/082560019(ATTACH MENT-L.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.