Laserfiche WebLink
ATTACHMENT L:CONSTRUCTION PROCEDURES <br /> throughout the well depth and repeated through the injection interval. The sequencing and <br /> interpretation of these logs is described in greater detail in Attachment I:Formation Testing <br /> Program. <br /> Lithologic Logs <br /> A lithologic ("Mud") log will be prepared during the drilling of the LEC-1 well. This log, <br /> included,will graphically describe at a scale of 2 inches= 100 feet the lithologic units found <br /> within the 30-foot to 4,575-foot interval of the LEC-1 well. The log will be prepared by <br /> visually describing the rock cuttings brought to the surface during the drilling operations <br /> via the mud circulation system.Since no cores are anticipated to be collected from the <br /> borehole,only cuttings and geophysical logs will be used to prepare the lithologic log. <br /> Final Descriptive Log Interpretation Report <br /> A descriptive log interpretation report will be prepared to describe in detail the Domengine <br /> Formation interval in the LEC-1 well upon completion of construction. That report will list, <br /> for each 2-foot depth interval between the depths of 3,642 feet and 4,575 feet,the calculated <br /> shale and sand volumes,water saturation,the porosity values as independently measured <br /> by the neutron and density logging tools,the apparent resistivity of the formation water, <br /> and provide a cross plot-derived ("best choice") porosity value for each interval. <br /> A compact disk containing the same information at single foot intervals,will be prepared <br /> and used to calculate a (NaC1 equivalent) salinity value at each 1-foot depth interval. A <br /> listing of those results obtained throughout the proposed 4,230-foot to 4,570-foot completion <br /> interval within the Domengine Formation will be included in the submittal at the end of <br /> construction. <br /> Deviation Checks <br /> Single shot deviation checks will be made at 10 equidistant or equal spaced depths in the <br /> well bore,ranging from 500 feet to 4,575 feet (proposed total depth). Each deviation check <br /> will be individually reported, and a maximum allowable deviation from vertical by more <br /> than 11/2 degrees will be allowed. The absolute allowable maximum lateral displacement of <br /> the well at total depth will be 100 feet. If there is concern about deviation in the well bore, a <br /> gyroscope survey will be run. <br /> Proposed Well Completion <br /> Injection Interval <br /> Since subsurface conditions at the LEC-1 well are anticipated to closely match those at the <br /> adjacent STIG#1 well site,it is anticipated that the Domengine Formation sands will be <br /> poorly consolidated and flowing at the LEC-1 well. The proposed completion of the LEC-1 <br /> well will be nearly identical to that of the STIG #1 well: <br /> • Perforate the injection interval from 4,230 to 4,575 ft bgs using a down-hole perforation <br /> gun with 120 degree phasing and resulting in 0.3-inch diameter perforations every <br /> 4 inches <br /> SAC/371322/082560019(ATTACH MENT-L.DOC) L-3 <br />