Laserfiche WebLink
ATTACHMENT L:CONSTRUCTION PROCEDURES <br /> • Install 420 feet of 2-15/16-inch outside diameter screened liner inside perforated <br /> 4-1/2-inch liner from 4,155 to 4,575 feet,and place 12-20 mesh sand pack material <br /> between liner and screen for sand control. <br /> Injection Tubing and Packer <br /> Injection will be through a 41/2-inch nominal diameter, 10.5 pounds per foot, grade J-55 <br /> tubing set inside the 7-inch casing from the surface to a Baker Model AL-2 (or equivalent) <br /> Large Bore Lok-Set retrievable packer set at 3,340 ft bgs. <br /> Annular Fluid <br /> After the well is completed,the annular space between the 41/2-inch diameter injection <br /> tubing and the 7-inch casing will be filled with fresh water containing corrosion inhibitor <br /> and algaecide. <br /> L-4 SAC1371322/082560019(ATTACH MENT-L.DOC) <br />