Laserfiche WebLink
ATTACHMENT 0:PLANS FOR WELL FAILURES OR SHUT-INS <br /> Long-term Interruptions <br /> Long-term interruptions could include well-failure, significant equipment failure, or poor <br /> well operation. NCPA has prepared this application to enable installation of a third well, <br /> LEC-2,at the STIG-LEC facility if power plant operations are not able to be maintained at <br /> appropriate levels. If long-term interruptions occur, short-term procedures will be <br /> implemented as long-term solutions are developed. If installation of the third well is <br /> initiated,activities would be coordinated with EPA and applicable local and state agencies <br /> as they will be for installation of LEC-1. <br /> 0-2 SAC/371322/082560025(ATTACH MENT-O.DOC) <br />