My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTENTS,CONTINUED <br /> Attachment G: Geological Data on Injection and Confining Zones (Class II) <br /> (NOT REQUIRED) <br /> Attachment H: Operating Data <br /> Application Requirements.................................................................................................H-1 <br /> Approach..............................................................................................................................H-1 <br /> Attachment I: Formation Testing Program <br /> Application Requirements...................................................................................................I-1 <br /> Approach................................................................................................................................l-1 <br /> Determination of Fluid Pressure in the Confining and Injection Zones.......................1-1 <br /> Determination of Temperature in the Injection Zone......................................................I-2 <br /> Determination of Fracture Pressure in the Injection Zone..............................................1-2 <br /> Determination of Physical, Chemical and Radiological Characteristics of the <br /> InjectionZone........................................................................................................................I-2 <br /> Direction and Rate of Groundwater Movement in Deep Marine Sandstones.............1-6 <br /> Direction and Rate of Injected Fluid Migration................................................................I-7 <br /> Attachment J: Stimulation Program <br /> Application Requirements...................................................................................................J-1 <br /> Approach................................................................................................................................J-1 <br /> Anticipated Initial Conditions at the LEC-1 Well.............................................................J-1 <br /> Conditions That Could Result in Stimulation in the Future...........................................J-1 <br /> Methods to Minimize Future Stimulation Needs.............................................................J-2 <br /> Attachment K: Injection Procedures <br /> ApplicationRequirements................................................................................................. K-1 <br /> Approach.............................................................................................................................. K-1 <br /> Operational Overview........................................................................................................ K-1 <br /> InjectionRates...................................................................................................................... K-2 <br /> Injection Pressures.............................................................................................................. K-2 <br /> WasteStreams ..................................................................................................................... K-3 <br /> Attachment L: Construction Procedures <br /> Application Requirements..................................................................................................L-1 <br /> Approach...............................................................................................................................L-1 <br /> Casing and Cementing Program........................................................................................L-1 <br /> LoggingProcedures.............................................................................................................L-2 <br /> DeviationChecks.................................................................................................................L-3 <br /> Proposed Well Completion.................................................................................................L-3 <br /> AnnularFluid.......................................................................................................................L-4 <br /> Attachment M: Construction Details <br /> Application Requirements.................................................................................................M-1 <br /> Approach..............................................................................................................................M-1 <br /> Attachment N: Changes in Injected Fluid (NOT REQUIRED) <br /> v SACI3713221082590002(CONTENTS AND ACRONYMS.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.