Laserfiche WebLink
CONTENTS,CONTINUED <br /> Attachment G: Geological Data on Injection and Confining Zones (Class II) <br /> (NOT REQUIRED) <br /> Attachment H: Operating Data <br /> Application Requirements.................................................................................................H-1 <br /> Approach..............................................................................................................................H-1 <br /> Attachment I: Formation Testing Program <br /> Application Requirements...................................................................................................I-1 <br /> Approach................................................................................................................................l-1 <br /> Determination of Fluid Pressure in the Confining and Injection Zones.......................1-1 <br /> Determination of Temperature in the Injection Zone......................................................I-2 <br /> Determination of Fracture Pressure in the Injection Zone..............................................1-2 <br /> Determination of Physical, Chemical and Radiological Characteristics of the <br /> InjectionZone........................................................................................................................I-2 <br /> Direction and Rate of Groundwater Movement in Deep Marine Sandstones.............1-6 <br /> Direction and Rate of Injected Fluid Migration................................................................I-7 <br /> Attachment J: Stimulation Program <br /> Application Requirements...................................................................................................J-1 <br /> Approach................................................................................................................................J-1 <br /> Anticipated Initial Conditions at the LEC-1 Well.............................................................J-1 <br /> Conditions That Could Result in Stimulation in the Future...........................................J-1 <br /> Methods to Minimize Future Stimulation Needs.............................................................J-2 <br /> Attachment K: Injection Procedures <br /> ApplicationRequirements................................................................................................. K-1 <br /> Approach.............................................................................................................................. K-1 <br /> Operational Overview........................................................................................................ K-1 <br /> InjectionRates...................................................................................................................... K-2 <br /> Injection Pressures.............................................................................................................. K-2 <br /> WasteStreams ..................................................................................................................... K-3 <br /> Attachment L: Construction Procedures <br /> Application Requirements..................................................................................................L-1 <br /> Approach...............................................................................................................................L-1 <br /> Casing and Cementing Program........................................................................................L-1 <br /> LoggingProcedures.............................................................................................................L-2 <br /> DeviationChecks.................................................................................................................L-3 <br /> Proposed Well Completion.................................................................................................L-3 <br /> AnnularFluid.......................................................................................................................L-4 <br /> Attachment M: Construction Details <br /> Application Requirements.................................................................................................M-1 <br /> Approach..............................................................................................................................M-1 <br /> Attachment N: Changes in Injected Fluid (NOT REQUIRED) <br /> v SACI3713221082590002(CONTENTS AND ACRONYMS.DOC) <br />