My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTENTS,CONTINUED <br /> Attachment O: Plans for Well Failures or Shut-ins <br /> Application Requirements .................................................................................................0-1 <br /> Approach..............................................................................................................................0-1 <br /> Contingency Plan for Well Failures or Shut-Ins..............................................................0-1 <br /> Attachment P:Monitoring Program <br /> Application Requirements ................................................................................................. P-1 <br /> Approach..............................................................................................................................P-1 <br /> Mechanical Integrity Monitoring/Reporting Program..................................................P-1 <br /> Injection Fluid Monitoring/Reporting Program.............................................................P-2 <br /> Groundwater Monitoring Program.................................................................................. P-3 <br /> Attachment Q: Plugging and Abandonment Plan <br /> Application Requirements .................................................................................................Q-1 <br /> Approach..............................................................................................................................Q-1 <br /> Plugging and Abandonment Description........................................................................Q-1 <br /> CostEstimate........................................................................................................................Q-2 <br /> Attachment R: Necessary Resources <br /> Application Requirements .................................................................................................R-1 <br /> Financial Assurance Statement..........................................................................................R-1 <br /> Attachment S:Aquifer Exemptions (NOT REQUIRED) <br /> Attachment T: Existing EPA Permits <br /> Application Requirements .................................................................................................T-1 <br /> Permits..................................................................................................................................T-1 <br /> Attachment U: Description of Business <br /> ApplicationRequirements .................................................................................................U-1 <br /> Approach..............................................................................................................................U-1 <br /> References <br /> Tables <br /> A-1 Measured Reservoir Properties <br /> A-2 Volumetric Calculations Summary for 10 Year <br /> A-3 Volumetric Calculations Summary Including Dispersion for 30 Years <br /> A-4 Allowable Pressure Increase Calculations <br /> A-5 Zone of Endangering Influence Calculations Summary (425 gpm) <br /> A-6 Pressure Buildup Calculations Summary—LEC-1 <br /> A-7 DOGGR Wells within 2 Miles of the Site <br /> A-8 Pressure Increase and Hydrostatic Mud Pressure at Wells Within the AOR <br /> B-1 Summary of Groundwater Wells in the Area of Review <br /> B-2 Summary of Deep Wells Drilled in and Near the Area of Review <br /> C-1 Summary of Deep Wells Drilled in and Near the Area of Review <br /> C-2 Pressure Changes at Deep Wells Within the AOR Resulting from Injection at STIG-1 <br /> and LEC-1 <br /> SAC/371322/082590002(CONTENTS AND ACRONYMS.DOC) v <br />
The URL can be used to link to this page
Your browser does not support the video tag.