My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:35:34 AM
Creation date
9/26/2019 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> (d) Date(s) laboratory analyses were performed; <br /> (e) Name(s) of individual(s) who performed laboratory analyses; <br /> (fl Types of analyses; and <br /> (g) Results of analyses. <br /> 3. Monitoring Devices <br /> (a) Continuous monitoring devices <br /> Temperature, annular pressure, and injection pressure shall be measured at <br /> the wellhead using equipment of sufficient precision and accuracy. All <br /> measurements must be recorded at minimum to a resolution of one tenth of <br /> the unit of measure (e.g. injection rate and volume must be recorded to a <br /> resolution of a tenth of a gallon; pressure must be recorded to a resolution of <br /> a tenth of a psig; injection fluid temperature must be recorded to a resolution <br /> of a tenth of a degree Fahrenheit). Exact dates and times of measurements, <br /> when taken,must be recorded and submitted. Injection rate shall be measured <br /> in the supply line immediately before the wellhead. The Permittee shall <br /> continuously monitor and record the following parameters at the prescribed <br /> frequency: <br /> Monitoring Parameter Frequency fdliital <br /> ument <br /> Injection-rate(gallons per minute Hourlyrecorder <br /> Dail Injection Volume (gallons) Dail digitaltotalizer <br /> Total Cumulative Volume(gallons) Dail <br /> it <br /> totalizer <br /> Well head injection pressure si Hourlyrecorder <br /> Annular pressure si Hourlyrecorder <br /> Injection fluid temperature <br /> (degrees Fahrenheit Hourly digital recorder <br /> The Permittee is required to adhere to the preferred format below for <br /> reporting injection rate and well head injection pressure. An example of the <br /> preferred electronic data format: <br /> j DATE TIME INJ. PRESS (PSIG) INJ.RATE(GPMI <br /> 06/27/09 16:33:16 1525.6 65.8 <br /> 06/27/09 17:33:16 1525.4 66.3 <br /> Each data line shall include four (4) values separated by a consistent <br /> combination of spaces or tabs. The first value contains the date measurement <br /> in the format of mm/dd/yy or mm/dd/yyyy , where mm is the number of the <br /> FINAL UIC Permit CA10910003 <br /> Page 19 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.