My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:35:34 AM
Creation date
9/26/2019 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Reporting <br /> Quarterly, the Permittee shall submit accurate reports to EPA containing, at <br /> minimum,the following information: <br /> (a) Hourly and daily values, submitted in electronic format, for the continuously <br /> monitored parameters specified for the injection wells in paragraph 3(a) of <br /> this section; <br /> (b) Monthly cumulative total volumes, as well as monthly average, minimum, <br /> and maximum values for the continuously monitored rate, pressure, and <br /> temperature parameters specified for the injection wells in paragraph 2(a) of <br /> this section,unless more detailed records are requested by EPA; <br /> (c) Quarterly analyses, to be included in the next quarterly report following <br /> completion: <br /> (i) Injection fluid characteristics for parameters specified in paragraph <br /> 1(a)of this section; <br /> (ii) When appropriate, Injectate Hazardous Waste Determination <br /> according to Section D,paragraph 1(b) of this part. <br /> (d) To be included with the next quarterly report immediately following <br /> completion, results of any additional MITs or other tests required by EPA, <br /> and any'well workovers completed; and <br /> (e) To be included in the quarterly report due in January each year,the following <br /> annual analyses: <br /> (i) Annual reporting summary(7520-11 in Appendix C); <br /> (ii) FOT results as required in Section B,paragraph 3(c)of this part; <br /> (iii) Shut-in static reservoir pressure cumulative behavior plot of the <br /> injection zone, as required in Section B, paragraph 3(c)(ii) of this <br /> part; <br /> (iv) Annual injection profile survey results as required in Section D' <br /> paragraph 2(a)(iii) of this part; and <br /> (v) Annual ZEI recalculation for each well as required in Section B <br /> paragraph 3(c) of this part. <br /> l <br /> FINAL UIC Permit CAI 0910003 <br /> Page 21 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.