Laserfiche WebLink
(b) After drilling is completed, the Permittee must submit final field coordinates <br /> (Section, Township, Range, with latitude/longitude) of any well constructed <br /> tinder this permit with the Final Well Constriction Report required under <br /> paragraph 9(a) of this section. If final well coordinates differ from the <br /> proposed coordinates submitted under paragraph (a) above,justification and <br /> documentation of any communication with and approval by EPA shall be <br /> included. <br /> 2. Testing during Drilling and Constructs <br /> Los and other tests ondu d during drilling and constriction shall include, at a <br /> minimum V7 1t on , e s, casing logs, and iniectson f rmation tests as outlined in <br /> 4'O CER§146.12 d . O Hole logs shall be conducted over the entire open hole <br /> ss i 3i�e a ow a conductor casing. Permittee shall conduct Formation Evaluation <br /> wireline logging operations and shall provide and use those results to estimate and <br /> report values for hydrocarbon saturation, porosity, lithology, rock mechanical <br /> properties for both the injection and confining zones identified within the permitted Opp �r <br /> geological sequence. a� <br /> Before surface, intermediate, and long string casings are set, dual <br /> induction/spontaneous potential/gamma ray/caliper (DIL/S 'JGR/CAL) logs will be <br /> run over the course of the entire open hole sequence after the well is drilled to each <br /> respective terminal depth. After each casing is set and cementing is completed, a <br /> spherically focused cement bond evaluation log(CBL)will be run over the course of <br /> the entire cased hole sequence(See Section D.2(a)(iv)of this part).-e" <br /> 3. Iniection Formation Testine 4 peg)-- s.ar'z 74")- /04 <br /> Injection formation information as described in 40 CFR 146.12(e), shall be <br /> determined through well logs and tests and shall include porosity, permeability, <br /> static formation pressure, and effective thickness of the injection zone. Reservoir <br /> compressibility (typically coefficient "c") must also be computed. A summary of <br /> results shall be submitted to EPA with the Final Construction Report required in <br /> paragraph 9(a) of this section and updated periodically with subsequent analyses. <br /> (a) Ground Water Testing <br /> During construction of the wells, information relating to ground water at <br /> these sites shall be obtained and submitted to EPA. This information shall <br /> include direct Total Dissolved Solids ("TDS") analysis of target injection <br /> formation water to demonstrate either the presence and characteristics of, or <br /> the lack of, any Underground Sources of Drinking Water ("USDW," as <br /> i <br /> defined in 40 CFR §144). <br /> FINAL UIC Permit CAI 0910003 <br /> Page 6 of 29 <br />