Laserfiche WebLink
0 <br /> Stantec <br /> PEA WORKPLAN <br /> Proposed Lodi Energy Center Site <br /> Lodi, California <br /> 9.0 PROJECT MANAGEMENT PLAN <br /> The project organization for the site assessment is discussed below. <br /> 9.1 REGULATORY OVERSIGHT AGENCY <br /> The Department of Toxic Substances Control (DTSC) will be the lead agency overseeing the <br /> project and reviewing the Workplan and PEA report. <br /> 9.2 CLIENT APPROVALS <br /> Implementation of this Workplan will be managed through the City of Lodi, Site property owner, <br /> under the direction of Mr. Charles Swimley. Mr. Swimley will receive all notices, comments, <br /> approvals and other communications from the DTSC, and other parties. Mr. Swimley will also <br /> directly oversee and authorize the work of Stantec. <br /> 9.3 STANTEC PROJECT MANAGER <br /> The Stantec Project Manager (PM), Mr. Gary Haeck, Ph.D., P.G., is a California Professional <br /> Geologist and will be responsible for ensuring that all project personnel are made available and <br /> that all activities associated with the project are conducted in a manner consistent with the <br /> Workplan. Mr. Haeck will be the primary liaison between DTSC, the City, and Stantec, and Mr. <br /> Haack will monitor day-to-day activities to ensure that quality work is done on time and within <br /> budget. He will also be responsible for reporting work progress and findings to the City. <br /> 9.4 STANTEC QA/QC MANAGER <br /> The Stantec Project Quality Assurance/Quality Control (QA/QC) Manager, Ms. Sandra <br /> Pimienta, P.G., will be responsible to establish and implement the QA/QC program to ensure <br /> that established sampling ,and analytical procedures are properly followed, direct Stantec <br /> Quality Assurance (QA) personnel to implement the appropriate field QA measures, and review <br /> the project activities to verify that project QA goals are met. The Project QA/QC Manager will <br /> report to the Stantec PM and will coordinate the necessary technical reviews. <br /> 9.5 STANTEC FIELD PROJECT MANAGERS <br /> The Stantec Field Project Managers (FPMs), Mr. Gary Haack, Ph.D., P.G, Ms. Sandra Pimienta, <br /> P.G., and Mr. Brian Rorie will be responsible to act as the managers of daily field operations. <br /> Mr. Haack will be primarily responsible for field activities including project schedule, budget <br /> tracking, and assigning project personnel and resources. Both Mr. Haeck and Ms. Pimienta will <br /> direct the implementation of the Workplan, and ensure quality. The Stantec FPMs will report to <br /> the Stantec PM and will also receive direction or authorization directly from the City PM. <br /> PEA WP-Lodi 18 August 13,2009 <br />