My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:35:34 AM
Creation date
9/26/2019 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Stantec <br /> PEA WORKPLAN <br /> Proposed Lodi Energy Center Site <br /> Lodi, California <br /> 9.0 PROJECT MANAGEMENT PLAN <br /> The project organization for the site assessment is discussed below. <br /> 9.1 REGULATORY OVERSIGHT AGENCY <br /> The Department of Toxic Substances Control (DTSC) will be the lead agency overseeing the <br /> project and reviewing the Workplan and PEA report. <br /> 9.2 CLIENT APPROVALS <br /> Implementation of this Workplan will be managed through the City of Lodi, Site property owner, <br /> under the direction of Mr. Charles Swimley. Mr. Swimley will receive all notices, comments, <br /> approvals and other communications from the DTSC, and other parties. Mr. Swimley will also <br /> directly oversee and authorize the work of Stantec. <br /> 9.3 STANTEC PROJECT MANAGER <br /> The Stantec Project Manager (PM), Mr. Gary Haeck, Ph.D., P.G., is a California Professional <br /> Geologist and will be responsible for ensuring that all project personnel are made available and <br /> that all activities associated with the project are conducted in a manner consistent with the <br /> Workplan. Mr. Haeck will be the primary liaison between DTSC, the City, and Stantec, and Mr. <br /> Haack will monitor day-to-day activities to ensure that quality work is done on time and within <br /> budget. He will also be responsible for reporting work progress and findings to the City. <br /> 9.4 STANTEC QA/QC MANAGER <br /> The Stantec Project Quality Assurance/Quality Control (QA/QC) Manager, Ms. Sandra <br /> Pimienta, P.G., will be responsible to establish and implement the QA/QC program to ensure <br /> that established sampling ,and analytical procedures are properly followed, direct Stantec <br /> Quality Assurance (QA) personnel to implement the appropriate field QA measures, and review <br /> the project activities to verify that project QA goals are met. The Project QA/QC Manager will <br /> report to the Stantec PM and will coordinate the necessary technical reviews. <br /> 9.5 STANTEC FIELD PROJECT MANAGERS <br /> The Stantec Field Project Managers (FPMs), Mr. Gary Haack, Ph.D., P.G, Ms. Sandra Pimienta, <br /> P.G., and Mr. Brian Rorie will be responsible to act as the managers of daily field operations. <br /> Mr. Haack will be primarily responsible for field activities including project schedule, budget <br /> tracking, and assigning project personnel and resources. Both Mr. Haeck and Ms. Pimienta will <br /> direct the implementation of the Workplan, and ensure quality. The Stantec FPMs will report to <br /> the Stantec PM and will also receive direction or authorization directly from the City PM. <br /> PEA WP-Lodi 18 August 13,2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.