Laserfiche WebLink
staattLc <br /> PEA WORKPLAN <br /> Proposed Lodi Energy Center Site <br /> Lodi, California <br /> 8.0 REPORT PREPARATION <br /> Upon completion of the PEA field activities, Stantec will prepare a PEA Report detailing the field <br /> investigation and sampling procedures in general compliance with the PEA Manual. The report <br /> will contain a description of the completed field activities and field methods, waste disposal <br /> documentation, deviations from the PEA Workplan, general findings about subsurface <br /> conditions, detected constituent concentrations and laboratory analytical reports (including <br /> chain-of-custody documentation), and comparison to previously agreed upon risk-based <br /> screening values. Soil boring logs including groundwater temporary well construction details will <br /> be signed by a professional geologist. Field logs generated from soil and groundwater and <br /> sampling activities will also be appended to the report. A State of California Registered <br /> Professional Geologist will sign and stamp the final report. <br /> PEA WP-Lodi 17 August 13,2009 <br />