My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3019
>
2900 - Site Mitigation Program
>
PR0507169
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2019 4:58:04 PM
Creation date
10/2/2019 4:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507169
PE
2950
FACILITY_ID
FA0007724
FACILITY_NAME
HYDRO-AGRI
STREET_NUMBER
3019
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
3019 NAVY DR
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Michael Infurna Project 92097-070.026 <br /> September 24, 1997 <br /> Page 3 <br /> Groundwater samples will be collected following standard sampling protocol. The <br /> depth to groundwater is estimated to be from 1 to 5 feet bgs. Samples will be <br /> submitted with chain-of-custody documentation to a state-certified analytical <br /> laboratory. <br /> • Laboratory analysis for nitrate as nitrogen by EPA Method 300.0; ammonia as <br /> nitrogen by EPA Method 350.3; total petroleum hydrocarbons as gasoline by EPA <br /> Method 8015M/LUFT; total petroleum hydrocarbons as diesel by EPA <br /> Method 8015M/LUFT; benzene, toluene, ethylbenzene, and xylenes by EPA <br /> Method 8020. Samples will be analyzed on standard 10-day turnaround. <br /> Task 3 - Report Preparation <br /> EMCON will prepare a written report that documents the findings from the activities <br /> performed under Tasks 1 and 2 of this proposal. The report will include EMCON's <br /> conclusions regarding the potential for the presence of adverse impacts to the property. The <br /> report will be prepared consistent with ASTM guidelines for the preparation of Phase I <br /> ESA reports. EMCON will provide two originals of the report. <br /> SCHEDULE <br /> EMCON has scheduled the field activities to be conducted on Friday, October 3, 1997. <br /> Please call if you have any questions. <br /> Sincerely, <br /> EMCO <br /> Charles S. Metzinger <br /> Project Manager <br /> Attachments: Drawing 1 <br /> SAC�KAAGRIwP.D0C-97Thrd:2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.