Laserfiche WebLink
06 June 2001 <br /> AGE-NC Project No. 98-0533 <br /> Page 5 of 5 <br /> 4.0. PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Registered Geologist. Procedures for the advancement of soil borings, soil sampling,ground water <br /> sampling, equipment decontamination, and boring abandonment were outlined in the original <br /> Preliminary Site Assessment Work Plan. <br /> Advanced Geo Environmental,Inc. <br />