My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:07:45 AM
Creation date
10/3/2019 8:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , 4 <br /> Overhead/Lodi Door Company -3- 3 October 1990 <br /> The S, T and K values are usually estimated from data collected when performing a <br /> pumping test. <br /> We discussed the problems with conducting a pumping test on the shallow ground water <br /> zone, using the existing monitoring well system at the 0/LDC facility. The wells are <br /> only two inches in diameter, the water table is probably less than nine feet above the <br /> bottom of the well screens, and there may be multiple shallow water bearing zones (i .e. <br /> the wells might not all be screened in the same water bearing zone) . An alternative <br /> is to wait for the ground water table to return to higher levels before conducting <br /> additional aquifer tests on the shallow ground water zone. <br /> We also discussed the problem of defining the ground water gradient. The gradient <br /> changes depending on which wells you choose for the calculation. It has been <br /> hypothesized that multiple shallow water bearing zones exist beneath the site. It <br /> appears that the ground water gradient is in the southeasterly or easterly direction. <br /> (Mr. Glick stated that he feels the gradient is in an easterly direction.) If that is <br /> true, MW-1 and MW-2 are downgradient from the impoundment. <br /> The July 1990 sampling data showed chromium at 0.081 mg/l in MW-2. MW-2 is on the <br /> southern boundary of 0/LDC's facility. Therefore, Mr. Vaughn stated that additional <br /> wells would be necessary to define the plume. Mr. Poole and Mr. Schweizer stressed <br /> that they don't believe the chromium levels in the ground water are significant enough <br /> to warrant the cost of further investigation. Additional downgradient wells may need <br /> to be placed off site, since existing contaminated wells are at the property boundary. <br /> We agreed to look further into the chromium issue and determine what the Board will <br /> require in terms of future monitoring and installation of additional monitoring wells. <br /> JEM:jm <br /> Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.