My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:08:07 AM
Creation date
10/3/2019 8:44:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • hn KLEINFELDER <br /> 1 <br /> ' 1 INTRODUCTION <br /> ' The following work plan presents the methodologies and major elements <br /> ' associated with the collection of Surface Impoundment (SI) soil samples at <br /> the Overhead/Lodi Door Company (0/LDC) facility, Lodi, California. <br /> Information contained herein is intended to satisfy requirements of the <br /> Department of Health Services (DOHS), San Joaquin Local Health District, <br /> ' and the Regional Water Quality Control Board (RWQCB) . This work plan was <br /> developed in concert with the aforementioned agencies in order to obtain <br /> metal concentrations that remain in soils beneath the SI after initial <br /> ' excavation. Analyses of these soil samples will be compared to analyses <br /> of background soil samples previously obtained from other locations on the <br /> ' 0/LDC Facility. In this manner, future excavation depths and quantities <br /> can be estimated. The ultimate goal is to achieve clean closure of the <br /> ' Si. <br /> 1 <br /> 1 <br /> 1 <br /> 51-87-413 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.