My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:08:07 AM
Creation date
10/3/2019 8:44:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM • <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD - CENTRAL VALLEY REGION <br /> 3443 Routier Road Phone: (916) 361-5600 <br /> Sacramento, CA 95827-3098 ATSS: 8-495-5600 <br /> TO: Greg K. Vaughn FROM: John K. Woodling <br /> Sr. Engineer, TPCA Unit Eng. Geologist, TPCA Unit <br /> DATE: 13 July 1987 SIGNATURE: <br /> L' <br /> SUBJECT: Meeting to discuss Overhead/Lodi Door/Co. (O/LDC) HAR W04 Plan <br /> The purpose of this meeting, held on 8 July 1987 , was to discuss the <br /> O/LDC hydrogeological assessment report (HAR) work plan, and certain <br /> parts of the closure plan which relate to the HAR, to provide Dallas <br /> Corporation (Dallas) with guidance on what additional work was <br /> necessary to complete an HAR for the O/LDC surface impoundment (SI) . <br /> In attendance were: <br /> John K. Woodling, RWQCB <br /> Greg K. Vaughn, RWQCB <br /> James Harvey, Dallas Corp. <br /> Kent Zenobia, J.H. Kleinfelder (JHK) <br /> Todd Croft, J.H. Kleinfelder <br /> CLOSURE PLAN <br /> Soil samples are to be taken from borings penetrating the entire <br /> vadose zone at one background location and at one location through <br /> the impoundment after the excavation of wastes. The following <br /> parameters were agreed upon for chemical characterization of these <br /> soils: <br /> EC and pH <br /> ICAP Metals scan <br /> As, Hg, and Se by AA <br /> Chloride, Nitrate and Sulfate <br /> TDS on a DI leach of soil (agreed upon in 8 July 1987 phone <br /> conversation) <br /> Moisture Content (Background samples at the elevation of the <br /> pond bottom and the confirmation level) <br /> Soil moisture of the confirmation samples will be determined for <br /> comparison to background. Grain size analysis will not be performed <br /> on vadose zone samples. <br />
The URL can be used to link to this page
Your browser does not support the video tag.