My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:08:07 AM
Creation date
10/3/2019 8:44:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. H. KLEINFELDER & ASSOCIATES <br /> r <br /> File: W-2001-1 <br /> January 29 , 1986 <br /> Page 13 <br /> characterization and well comparisons. The analytical results <br /> are summarized for organics on Table 4, and for metals and major <br /> _ ions on Table 5. The analytical results from Agricultural and <br /> Priority Pollutants Laboratory, Inc. (APPL) are in Appendix "B". <br /> B. Quality Assurance <br /> Quality assurance procedures were incorporated into drilling, <br /> sampling, and analytical activities during this investigation. <br /> r <br /> During drilling and well construction , the drill augers, soil <br /> sampling equipment, and well casings were steam cleaned prior to <br /> use or installation in each boring. No glues or solvents were <br /> used in well construction. Only washed, graded sand was used in <br /> the sand pack. A bentonite seal was placed above the sand pack. <br /> Well annulus above the bentonite seal was filled with a cement <br /> grout to protect against surface infiltration. <br /> Before developing and sampling each well, the equipment exterior <br /> surfaces were steam cleaned and hot water pumped through all <br /> pumps and tubing. During development the wells were pumped to <br /> minimize silt in the wells. Before sampling the wells were <br /> purged so the sample would be representative of the formation <br /> water. The samples were collected only after the field <br /> ER7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.