Laserfiche WebLink
) <br /> Tylar McMillan's Well Service <br /> 12302 Andes Ave. Bakersfield CA, 93312 <br /> Phone: (916) 761-5224 Email: mcmillans521 na -mail.com <br /> Website:www.wellblaster.com <br /> Date: October 21,2020 BLASTING WORK PLAN <br /> Well: MW 1 Location: 23987 CA-99 Plan date and time : Pending <br /> Casing 2-inch ID PVC to 85 feet Apo,CA 95220 <br /> r �—Sealing pipe Boosters <br /> GL Density g/cc 1.55 glee <br /> Detonation Velocity 24,000 ft/s 7,315 nr/s <br /> i Product List:NONEL MS Starter Casing Diameter 2 inches <br /> i Primaline 5 Charge Wt. 0 Kg - grams <br /> i <br /> i <br /> 10' i Detonation pressure 207 klbar <br /> i Primaline 5 Total energy ea. - klbar <br /> Start 60 feet <br /> i Pressure at casing - k/bar - psi <br /> i Intervals Linear Pressure at IO feet 0.00 - psi <br /> ' End 85 feet <br /> Strength 25 grain <br /> 20 i Total 25 feet Explosive Cord <br /> i Density glee 1.60 glee <br /> ' Total Explosives Detonation Velocity 22,000 Ns 6,706 mis <br /> i <br /> .0875 lbs. Casing Diameter 2 inches <br /> � Grains 25 gr/ft 1.62 gJft <br /> 30' <br /> Detonation pressure 180 k/bar <br /> i <br /> Total energy pef ft. 11 k/bar <br /> Pressure at casing 3.48 k/bar 52,062 psi <br /> *These are estimated pressure for a empty well <br /> 40' <br /> Site procedure <br /> 1. Check site and measure well depth <br /> i 2. Clear work site of all unessential personal <br /> i 3. Lower charges and drop pipe into the well <br /> 50' <br /> ' 4. Pump sealing material to top of well <br /> i 5. Check and clear blast area(sound blast warning) <br /> i 6. Arm explosives <br /> r 7. Confirm area clear(final blast warning) <br /> r 8. Detonate charge <br /> i 9. Check hole and sound all clear <br /> 60' ' 10. Refill cement to top of well to form a mushroom cap <br /> Initiator placed at 60 feet <br /> i Delay: Oms Instant <br /> Name of Blaster Preparing Plan: Tylor McMillan <br /> 70' 'Tylor McMillan's Well Service reserves the right to change or modify the blast plan in <br /> i any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> i <br /> r <br /> r <br /> 80' <br /> 90, <br />