Laserfiche WebLink
Tylor McMillan's Well Service <br /> 12302 Andes Ave. Bakersfield CA, 93312 <br /> Phone: (916)761-5224 Email: mcmillans521 a email.cwm <br /> Website:www.wellblaster.com <br /> Date: October 21,2020 <br /> BLASTING WORK PLAN <br /> Well: MW2 Location: 23987 CA-99 Plan date and time : Pending <br /> Casing 2-inch ID PVC to 85 feet Acampo,CA 95220 <br /> i 4 Sealing pipe Boosters <br /> GL i Density g/cc 1.55 g(cc <br /> ' Product List: Detonation Velocity 24,000 tits 7,315 mis <br /> i <br /> ' NONEL MS Starter Casing Diameter 2 inches <br /> i <br /> Primaline 5 Charge Wt. 0 Kg - grams <br /> i <br /> 10, i Detonation pressure 207 k/bar <br /> i Primaline5 Total energy ea. - kfbar <br /> ' Start 60 feet <br /> i Pressure at cuing - k/bar - psi <br /> i intervals Linear Pressure at 10 feet 0.00 - psi <br /> End 85 feet <br /> Strength 25 grain <br /> 20' ' Explosive Cord <br /> Total 25 fee[ <br /> i Density g/cc 1.60 g/cc <br /> ' Total Explosives Detonation Velocity 22,000 Ills 6,706 mis <br /> � .OH7$ IbS. Casing Diameter 2 inches <br /> ' Grains 25 gdIl 1.62 gJR <br /> 30' <br /> ' Detonation pressure 180 k/bar <br /> Total energy pef R. 11 whar <br /> ' Pressure at casing 3.48 k/bar 52,062 psi <br /> ' *These are estimated pressure for a ern well <br /> i P Ph' <br /> 40' <br /> Site procedure <br /> ' 1. Check site and measure Weil depth <br /> i 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into die well <br /> ' 4. Pump sealing material to top of well <br /> 50' 5. Check and clear blast area(sound blast warning) <br /> i <br /> i 6. Ann explosives <br /> ' 7. Confirm area clear(final blast warning) <br /> ' 8. Detonate charge <br /> i 9. Check hole and sound all clew <br /> 60' ' 10. Refill cement to top of well to form a mushroom cap <br /> a ' Initiator placed at 60 feet <br /> i Delay: Oms Instant <br /> Name of Blaster Preparing Plan: Tylor McMillan <br /> 70' i *Tylor McMillan's Well Service reserves the right to change or modify the blast plan in <br /> t any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> t <br /> r <br /> r <br /> 80' ' <br /> r <br /> a <br /> 90' <br />