My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
2900 - Site Mitigation Program
>
PR0543879
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 9:55:10 AM
Creation date
10/3/2019 10:39:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543879
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024951
FACILITY_NAME
LODI AIRPORT
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00517007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23987 N STATE ROUTE 99 ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 G E IN NEWSOM <br /> GVVN <br /> eAurenn,A JARED BLUMENFELD <br /> Water Boards v EECRDNUEARY FOR <br /> -CCRUNNENTAR PROTECTION <br /> Central Valley Regional Water Quality Control Board <br /> 12 November 2020 <br /> Robert Kupka <br /> Lodi Airport Corporation <br /> P.O. Box 10 <br /> Acampo, CA 95220 <br /> RESPONSE TO WELL DESTRUCTION WORK PLAN, GOLDEN EAGLE AVIATION/ <br /> LODI AIRPORT, 23987 HIGHWAY 99, ACAMPO, SAN JOAQUIN COUNTY, LUST <br /> CASE #391083 <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br /> reviewed the Work Plan for Monitoring and Soil Gas Well Destruction (Work Plan) dated <br /> 27 October 2020, submitted on your behalf by Steven G. Muir Consulting Geologist & <br /> Geophysicist (Muir) for the Golden Eagle/Lodi Airport underground storage tank (UST) <br /> petroleum release case at 23987 Highway 99 in Acampo (Site). In the Work Plan, Muir <br /> proposes to destroy the remaining Site wells as follows: <br /> Type Well Total Screen Depth Interval Destruction Method <br /> ftb s ftb s <br /> V-1 thru V-7 <br /> Soil Gas V100 thru V102 6ft -- Hand Auger <br /> HA/SGA thru <br /> HA/SG-7 <br /> Ground-water MW-1, MW-2 85 65-85 Explosives <br /> Monitoring MW-4 110 90-110 <br /> ft bgs= feet below ground surface <br /> Central Valley Water Board staff concurs with the scope of work as proposed in the <br /> Work Plan. However, San Joaquin County Environmental Health Department(SJCEHD) <br /> maintains jurisdictional authority over well destructions in San Joaquin County, so the <br /> proposed well destructions must be completed under, and in accordance with, County <br /> permits and requirements. By 5 February 2021, please submit a Well Destruction <br /> KARL E. LONGLEV SCD, P.E., CHAIR I PATRICK PULUPA, ESQ., EXECUTIVE OFFICER <br /> 11020 Sun Center Drive#200,Rancho Cordova,CA 96670 www.waterboards.ca.gov/centralvalley <br />
The URL can be used to link to this page
Your browser does not support the video tag.