Laserfiche WebLink
LEAK SPILL CONTROL PROCEDURES <br />A. Spill Control Leader: _ Jack Bishoo <br />B. Safety Equipment On -Hand (4, fuz =daguish=. Am -aid kiss-) <br />Equips Location <br />1 -each truck, each shop, wash rack, <br />Firs FX 1T1QLI15}1erC nffiru - <br />First Aid Station min Shop and office <br />Protective EQuip. (Sults, Tae11P'i — Qarh <br />Face shields, etc.) kept in locker .+ <br />Eye wash & Safety Showers Wash rack, wastewater pretreatment <br />C. Spill Control Equipment On -Hand (ix, k---) <br />Note -hazardous chemicals stored in contained areas <br />Equipment Locatioa <br />Adsorbent booms New shoo <br />shovels, buckets, etc. <br />D. Alarms and monitoring Equipment for Icak or spill detection <br />(i.c.. pH tnc=-s or m -line monuonn` dcvi=4._) <br />�- Equipment Location <br />3 au monirnrc. 2 nT_ waste water pretreatment system <br />control systems fully actomatic operation <br />E_ BE PREPARED! L19 clean up companies that you have identified which have the <br />capabilities to artist you during and after a hazardous material incident. <br />(lists of companies can be obtained through Environmental Hcalth (209) 468.3420.) <br />24 -Hour <br />Name Locadon Tckphone No. <br />�. 1, Self <br />2 <br />California Tank Lines is an approved hazardous waste hauler. <br />5 <br />