My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 3:15:27 PM
Creation date
10/3/2019 11:29:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jerry Yoshioka <br />August 18, 1995 <br />Page 3 <br />B3. Completion of a Source Reduction Plan <br />CTL has requested that Sierra -Pacific develop a proposal for completion of CTL's existing <br />Source Reduction Plan. Sierra -Pacific anticipates that the proposal will be submitted to <br />CTL for review by August 23, 1995. Upon acceptance of the proposal, Sierra -Pacific <br />anticipates that four weeks will be necessary to complete the Source Reduction Plan. <br />Anticipated Completion Date: September 25, 1995 <br />C. REQUEST FOR EXTENSION <br />On behalf of CTL, Siena -Pacific is requesting a 60 -day extension to address and implement the <br />identified compliance items. The extension would allow CTL to: <br />• Locate and schedule training programs within the months of August and September; <br />• Develop and implement a medical surveillance program; <br />• Evaluate Sierra -Pacific's Source Reduction Assistance Proposal; <br />• Gather and provide Sierra -Pacific with the necessary annual hazardous waste <br />generation information; <br />• Allow Sierra -Pacific to develop and distribute the Source Reduction Program; and <br />• Provide CTL the opportunity to modify its existing inspection program. <br />The compliance completion dates presented in Section B are anticipated to take less than 60 -days. <br />However, training schedule conflicts with employees and the availability of training sessions could <br />delay completion of the training requirements. A 60 -day extension would provide CTL the <br />flexibility to ensure that the subject compliance items are properly addressed. Should the extension <br />be granted, a completed Tiered Permitting Certification of Return to Compliance would be submitted <br />to your office no later than October 16, 1995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.