My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 3:15:27 PM
Creation date
10/3/2019 11:29:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jerry Yoshioka <br />August 18, 1995 <br />Page 2 <br />B. COMPLIANCE ITEM STATUS <br />Bl. Written Training Programs and Records. CTL is presently contacting occupational health <br />training organizations to schedule HAZWOPER training for its wash -rack employees. <br />Presently, CTL has identified the following HAZWOPER training needs: <br />POSITION <br />TRAINING REQUIREMENTS <br />(1) Wash -rack Supervisor 40 -Hour Hazardous Waste Operations & Emergency <br />Response Training + Supervisor Training (29 CFR <br />1910.120 (e)(3) and (4)). <br />(1) Wash -rack Manager 40 -Hour Hazardous Waste Operations & Emergency <br />Response Training (29 CFR 1910.120 (e)(3)). <br />Wash -rack Supervisor and 8 -Hour Refresher Training - Annual Required Up -date <br />Manager (29 CFR 1910.120 (e)(8)). <br />In addition, CTL is in the process of establishing a medical surveillance program for wash - <br />rack employees. <br />Anticipated Completion Date: September 30, 1995 <br />B2. Written Inspection Logs <br />CTL is in the process of up -dating its daily and monthly inspection forms. The amended <br />forms will address the hazardous material equipment and containment structures. The <br />purpose of the up -dated inspection forms is to provide facility personnel with the tools to <br />avoid an accidental material release that could adversely impact human health or the <br />environment. <br />Anticipated Completion Date: September 15, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.