Secondary Containment Assessment page A: <br /> Overhead view. <br /> ' WA <br /> Crass sectional (lateral) view. <br /> Volume aculations. <br /> Tank volume(largest tank): 7,400 gallons. <br /> Containment volume,(sum of areas 1,2& 3)= 14,363 gallons(gross) <br /> Less tante volume—376 gallons,containment volume= 13,987 goons(net) <br /> Volumelinch— 13987 X1124 in=582,8 gal/in <br /> Excess volume= 13987- 7400 gats. equivalent to 6587 gal/182.8 gal/in = 11.3 in <br /> 24 hr., 25 yr. storm=2.4 to 2.6"for most of San Joaquin Valley, <br /> Therefore, secondary containment volume is adequate. <br /> Design of containment area: Secondary containment is provided by a number of areas enclosed by poured <br /> concrete,or concrete block walls with re-bar. The containment arca does not have cracks or gaps to allow the <br /> escape of spilled inatcrial. Area 1 (East end) is connected to area 2 by an open 6 in. pipe,and area 2 is <br /> connoted to area 3 (West Grid)by a 6 in, pipe. These pipes will accommodate flow of 300 to 500 gpm <br /> depending upon the head. Area 1 is equipped with a level indicator for leak detection, which will sound,an <br /> alarm when liquid is detected. liquid is recycled using an AODD pump, <br /> Areas 1,2& 3 are coated with epoxy which is re-applied annually. <br /> Secor►dwy Containment Leak Tests—The pre-neutralizer area(Areas 1,2&.3), and the final neutralizer area, <br /> are filled with water(area 3 partially filled, area 1 T remove pumps before filling),and visually checked for <br /> leaks. Upon completion,the water is treated in the system and discharged to the sewer. Testing will be initiated <br /> this year or early next and repeated every five years. Appropriate records will be maintained. <br /> Site Security: The entire site is fenced. The gate is locked when company personnel are not pre=p. <br /> Smondary Containment findings: The secondary containment system is of sufficient capacity and condition <br /> Tor the containrneut of mleases from the 7,400 gallon wastewater tank and ancillary equipment. <br /> Initials: <br /> California Tank Lines, lnc- Wastewater processing Tanks(3) <br />