My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:15:14 AM
Creation date
10/3/2019 2:59:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Assessment Page Tank Name: Final Neutralizer Tanks <br /> Tank ages: Purchased new, used 20 years <br /> Remaining service life- Estimated 5 years. <br /> 'I.'aak Construction: <br /> Shape: Cylindrical, flat bottom,open top. <br /> Orientation: Vertical. <br /> Location: Above Ground, inside building (no sun exposure). <br /> Material of Construction: High Density Crosslinked Polyethylene <br /> Thickness_ 0.228"Tk. 1,0.249"Tk. 2, 0.182"Tk. 3,measured 6" below the top, <br /> Lying an ultrasonic gage_ <br /> Lining material and thickness: NA <br /> Corrosion protection equipment: IIIA <br /> Other identifying features: Seamless, Orae'Piece Construction,Natural, <br /> rotationally molded. <br /> Piping and ancillary equipment(pumps): <br /> Piping Material of Construction: Poly Vinyl Chloride(PVC). <br /> Piping Diameter: 3 in, <br /> Pump location: in pre,n.eutralizer area. <br /> Pump type/capacity: centrifugal pump-40 gpm <br /> Pipe from the pre-neutralizer pump to the final neutralizer tank,26 il._ long, is <br /> entirely within the secondary containment area, and is hydrostatically tested at 6 <br /> psi semi-aimually. <br /> Material Storage: <br /> Materials and characteristics: Wastewater with pFi between 7 and 10. <br /> Specific Gravity: approx_ 1 <br /> Operating Capacity: 370 gallons. <br /> Chemical compatibility findings: The materials identified above are compatible for <br /> contact with or proximity to the equipment,tank or tank system in this assessment. <br /> Initials:�u�7 <br /> Visual Inspection-- <br /> Tank <br /> nspection:Tank parameters at time of inspection: in use. <br /> Acute visual evidence of leaks: none. <br /> Condition of interior surface: good. <br /> Condition of exterior surface: good. <br /> Condition of nozzles, flanges, fittings at tank: good. <br /> Condition of piping: good. <br /> Visual Inspection findings: A visual inspection of the tanks and affiliated piping and <br /> ancillary equipment did not reveal silms of leaks, corrosion, weld cracks or breaks, or <br /> scrapes in protective coating which may cause a release from the tank system, A. <br /> description of ail discrepancies noted during the visual inspection is included with this <br /> report. Initials: <br /> California Tank Lines, Inc. Final Neutralizer Tanks (3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.