My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
0
>
2900 - Site Mitigation Program
>
PR0506644
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 3:26:43 PM
Creation date
10/4/2019 3:25:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506644
PE
2950
FACILITY_ID
FA0007565
FACILITY_NAME
UNION PACIFIC RAILROAD CO
STREET_NUMBER
0
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06201002
CURRENT_STATUS
01
SITE_LOCATION
0 HARNEY LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morgan Environmental Services <br /> 1091 Calcot Place Oakland, CA 94606 <br /> (510)533-2323(voice) <br /> (510)533-2345(fax) <br /> (510)533-2001(emergency/24hr) <br /> MES415@aol.com(internet) <br /> Monday, April 28, 1997 <br /> a. started on 3/17/97 and completed on 3/19/97 <br /> 4. Transport contaminated soils to an approved class 2 facility <br /> a. completed 3/21/97 <br /> 5. Obtain soil samples from areas with highest suspected concentrations <br /> from east and west side at train stop locations and transport under <br /> chain of custody to Chromalab in Pleasanton . <br /> a. five samples taken . Completed on 3/19/97 <br /> 6. Apply Bio-remediation material to contaminated dirt bank and dirt <br /> road on east and west sides at train stop location. Material to be used is <br /> LK-301. <br /> a. Completed on 3/20/97. See attached MSDS <br /> 7. Back fill dirt roadway on east and west side of the tracks at excavation <br /> site. <br /> a.Pending San Joaquin County approval <br /> 8. Obtain soil samples and under chain of custody run analysis on 5 <br /> sample locations no sooner that October 01, 1997, but no later than <br /> October 31,1997 for purposes of monitoring the Bio-treatment. <br /> a. Pending San Joaquin County approval <br /> 9. No action required from impact area to train stop location due to <br /> the 3500 gallons of diesel fuel being distributed over 3900 ft. of <br /> track bed with the material being contained and unrecoverable in <br /> the ballast area of the track bed. <br /> a. pending San Joaquin County approval <br /> Please contact me at your earliest convience if you have any question <br /> regarding our proposed Work Plan. <br /> Respectfully submitted, <br /> Tom Morgan <br />
The URL can be used to link to this page
Your browser does not support the video tag.