Laserfiche WebLink
' ACTON • NUCKELSON • van DANT f, INC. <br /> SA.WLING/DEVELOPMENT RNFORmA'T'ION <br /> Project Name <br /> S�P�o�eVelopraeat Point ��,/—/ � <br /> Sample I.D Project No r/t Y o <br /> Describe Samp�g�YeIopmant Point Work Order <br /> Date 7 is i 'offs/-�/-3728-C <br /> Feld Crew <br /> 79g�x �szs � fir- 5z� <br /> Well Depth 9E_a feet below MP �/•. <br /> Depth, to Water {below AMP) 7S o� Casing Diameter inches <br /> Discharge Rate feat <br /> Nuraber of borehole volumes dim Time f�� AMIP.vi <br /> evacuated before sampling- #j <br /> SamplingmevelOpment Method, <br /> Tap �_ Basler Centrifugal Pump <br /> Submerm--ble Other <br /> Pump intake or batter set at feet below Mp <br /> Sample Appeazauce_ <br /> Note any Sampling Problems _ <br /> Note any Equipment Washing_ C II <br /> Samples Collectedrru- ne= <br /> I <br /> EVACUATTONISTABILIZATION TEST DATA <br /> Temperature Cumulative <br /> Corrected Water Level Volume of Water Pumping <br /> pH Conductance Tem rature <br /> T"iaze Pe (nearest Removed from Well Rate <br /> (units) (umhos/cm) 0 .01 foot} (gallons} <br /> &Pm} <br /> 7 7- i.5-' <br /> OL <br /> 116 <br /> Bailing Start Time JG 5` WL 7 o Z <br /> Bailing Stop Tune <br /> Comments <br /> Si re Date <br />