Laserfiche WebLink
r <br /> ACTON • MICKELSON • van DAM, INC. <br /> SAMPLING/DEVELOPMENT INFORNNATION <br /> Project Name <br /> Sampling,/Development Point 1'1A1_—_:2 <br /> Sample I.D = Project No f.//_ r <br /> Describe Sampling/DeveFopnzent Point Work Order # 7,7 <br /> Date <br /> Feld Crew C� <br /> qq <br /> Well Depth feet below MP Casm- Diameter 5f�/ inches <br /> Depth to Water (below MP} 7_S 3 feet <br /> Discharge Rate gpm Time /s'd A.WL P.M <br /> Number of borehole volumes <br /> evacuated before sampling- a2 <br /> Sampling/Developmeut Method. I <br /> Tap Bader Ceutnfugal Pump 1 <br /> Subm=sr'ble Other <br /> Pump intake or baller set at `Z _feet below MP �� " 7s �) X G 6 = -5/57z �a�C <br /> Sample Appear ace- , <br /> Note any SampLmg Problems- <br /> Note any Equipment Washing- <br /> Samples Collected./Time: <br /> �IEYACUATTON/STABII.IZATION TEST DATA <br /> l <br /> Temperature Cumulative Water Level Volume of Water Rampin; <br /> pH Conductance Temperature (nearest Removed from Well Rate <br /> Time (units) (umhos/cin) (° 0 01 foot) (gallons) m) <br /> Bailing Start Time WL <br /> g Stop Tune /,e WL 7 9 5 2 <br /> Comments --- <br /> Si re Date l <br /> C�GGp rJ�_I / y'�, <br />