My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1448
>
2900 - Site Mitigation Program
>
PR0009096
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 8:46:21 AM
Creation date
10/9/2019 8:30:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009096
PE
2960
FACILITY_ID
FA0004082
FACILITY_NAME
U S CHEMICAL COMPANY
STREET_NUMBER
1448
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
14326007
CURRENT_STATUS
02
SITE_LOCATION
1448 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hardte9 LyNson Associates <br /> August 12, 1904 <br /> 11721 007 <br /> RWQCB <br /> bir.James arathovde <br /> Page 2 <br /> Excavation of the berm and final grading and compaction of the pond area will be performed upon <br /> receipt of chemical analysis indicating that wastes have been removed and approved by the RWQCB. <br /> Should chemical analysis indicate that soil beneath removed wastes require removal, further <br /> excavation and disposal will be conducted. <br /> Confirnratfon Sam ' <br /> To assess the potential for impact to soils beneath the pond, seven 2-foot borings and one 8-fool boring <br /> era proposed- The seven two font borings will be drilled within the pond. The seven borings will <br /> equal approximately one boring for every 3,000 square feet of pond surface. The 2-fool borings will be <br /> drilled upon removal of the sludge and pond water. The 8-fool boring trill be drilled outside the pond_ <br /> The purpose of this dor ng is to collect samples to be representative of background conditions. <br /> Samples will be collected at &0, 7.0,and BA feet bgs. These depths are intended to correlate with the <br /> sample depths from the pond_ This currelati❑n is based on the assumption that the pond bottom is <br /> approximately 0 feet lower than the surrounding groundsurface_ The borings will be drilled using <br /> hand auger drilling equipment. samples will be collected at the surface, 1.0, and 2.0 feet below the <br /> ground surface (bgsJ. The samples will be collected suing a hand driven sampler lined with stainless <br /> steel liners. Upon collection, the samples be capped. <br /> �ed al sealed, <br /> , labeled, <br /> ed, and under placed in a chain of custodyfilled <br /> container. The samples will be transportedYt <br /> procedures. <br /> Samples submitted to the laboratory will bo analyzed for the following: <br /> Arsenic Chromium <br /> Lead Nickel <br /> Sodium Chloride <br /> sulfate Sodium adsorption ratio <br /> The selected constituents are intended to be indicators that are representative of the pond contents <br /> based on the results of analyses from the provioUs waste characterization invcsligatiens_ To evaluate <br /> the potential for the soils to have been impacted, analytical results from the soil samples collected <br /> within the pond will be compared to the results from the samples collected from the 8-foot boring and <br /> the soil borings previously drilled at the site. <br /> Schedule and Reporting <br /> pond closure activities are anticipated to begin on August 15. 1994. Currently, it is anticipated that <br /> one week will be required to remove the remaining contents of pond. Upon completion of removal of <br /> the pond contents,the confirmation borings Will be drilled and sampled- Assuming a two week turn- <br /> around time for the laboratory, and a one week for a letter of preparation to <br /> submit <br /> to 9t e 4W QCS, a <br /> letter outlining the analytical results will be submitted to the RWQ on September <br /> Assuming an expedited review of the letter by the RWQCB.it is assumed that a determination if <br /> additional excavation is required or if closure is appropriate can be made within one week of submittal <br /> of the letter to the RWQCB. This schedule will allow approximately two weeks before the start of the <br /> rainy season (October 1, 1994) to conduct additional investigations andlor level the pond hack to <br /> original grade. <br /> L00 fill O.LN8RY8�V5 V'I9 CC9SV9C9T6T,�I, 00�5T b6:91/8D <br />
The URL can be used to link to this page
Your browser does not support the video tag.