My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1444
>
2200 - Hazardous Waste Program
>
PR0535125
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2024 4:33:23 PM
Creation date
10/9/2019 9:26:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535125
PE
2227
FACILITY_ID
FA0016178
FACILITY_NAME
URS MIDWEST INC DBA UNITED ROAD
STREET_NUMBER
1444
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11736030
CURRENT_STATUS
01
SITE_LOCATION
1444 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK ASSESSMENT Covey Auto Express Inc. 1444 EI Pinal Dr.,Stockton,CA 95205 <br /> Waste Oil Holding Tank Inspection 29 Aug 2012, D.K. Barber PE C 21,210,exp. 9/30/15 <br /> Est. Tank Age: 10 years Certified Steel Tank Institute, Level II, AST AC18709 <br /> Est.Tank Life of Service: 30 years <br /> 500 GA single wall steel AST, Waste Oil Storage, Mfg.: King Bros., Portland OR. <br /> Unknown date 22CCR§66265. <br /> Shape: Cylindrical Horizontal Single Wall <br /> Orientation: Horizontal Reference Sketch in Calculations & Photo 192(k)(1) <br /> Diameter 48 IN, Length 66 IN <br /> Location: Above ground on a reinforced Portland cement concrete floor 192(k)(2)(A) <br /> Thickness & method of determination: 192(k)(2)(B) <br /> Primary Shell 12 gauge steel (0.105 IN) , NDT Systems, TG110-DL Ultrasonic Testing Unit <br /> Lining material &thickness: None <br /> Corrosion Protection Equipment: None, exterior protective coating in good condition 192(k)(5) <br /> Structural Support: 3 @ Flat 2 IN Steel Channels Non-bolted Anchorage <br /> AST elevated approximately <1 IN above Portland cement concrete foundation pad <br /> Other identifying features: No UL Tag, white paint finish <br /> Chemical compatibility findings:The materials noted in the material;storage section described above are <br /> compatible with the material of construction or lining material noted in the tank construction section above. <br /> Initials:��./ <br /> Piping & Ancillary Equipment(pumps) 192(k)(2)(C&D) <br /> Piping Material of Construction: N/A <br /> Piping Size: N/A <br /> Pump Location: N/A <br /> Pump type/Capacity: N/A <br /> Material Storage <br /> Material & Characteristics: Waste Oil-Used Engine, ATF, Hydr.Oil, Gear Oil 192(k)(8) <br /> Non-RCRA Hazardous Waste, Class III combustible liquid <br /> Specific Gravity: SpG 0.85 -0.91 assume 0.91 <br /> Operating Capacity : Gross 500 GA Limit to 90% or 450 GA for Operating Capacity <br /> Visual Inspection 192(k)(9) <br /> Tank parameters at time of inspection: Partially full of waste oil <br /> Acute visual evidence of leaks: None <br /> Condition of interior surfaces: NIA <br /> Condition of exterior surfaces: Paint Fair condition <br /> Condition of nozzles, flanges, fittings at tank: Good condition, one topside <br /> Condition of piping: N/A <br /> Visual Inspection findings:A visual inspection of the tank and Its affiliated pumps,pumping and ancillary <br /> equipment did not reveal signs of leaks,corrosion,weld cracks or breaks,or scrapes in the protective coating <br /> which may contribute to the likelihood of a release occurring from the tank system. A de ption of all <br /> discrepancies noted during the visual inspection is included with this report. Initials: <br />
The URL can be used to link to this page
Your browser does not support the video tag.