Laserfiche WebLink
STATE OF CALIFORNIA <br />REQUIRED ACCEPTANCE TESTS'^ , <br />CEC-NRCC-MCH-04-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION -'-w- <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E <br />Required Acceptance Tests Page 3 of 3 <br />Project Name: 85C Bakery Stockton -Tenant Improvement Cate Prepared: 09-20-2015 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. 1 certify that this Certificate of Compliance documentation is accurate and complete. <br />Documentation Author NameJia Hui Pan <br />Documentation Author Signature: <br />Company: <br />JHP Engineering and Design Services,. Inc. <br />Signature. Date: <br />09-20-2018 <br />Address, <br />CEA/ HERS Certification Identification (if applicable): <br />3119 Central Parkway <br />P"°ne1 510-468-0613 <br />City/State/Zip: <br />Dublin / CA / 94565 <br />Phone: <br />510-465-0613 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />I certify the following under penalty of perjury, under the laws of the State of California: <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible <br />designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance <br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, <br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. <br />5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement <br />agencyfor all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the <br />building owner at occupancy. <br />Responsible Designer Name, <br />Responsible Designer Signature: <br />Jia Hui Pan <br />License: M35374 <br />Company <br />JHP Engineering and Design Services, Inc. <br />Date Signed: <br />09-20-2015 <br />Address: 3119 Central Parkway <br />License: M35374 <br />City/State/Zip: <br />Dublin /CA/ 94565 <br />Phone: <br />510-465-0613 <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 <br />STATE OF CALIFORNIA <br />REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS ,> <br />,FC-NRCC-MCH-05-E (Revised [71!16) CALIFORNIA ENERGY COMMISSION -fir <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E <br />Requirements for Packaged 5ingle-Zone Units (Page 1 of 2) <br />Prol eit Name: 85C Bakery Stockton - Tenant Improvement Date Prepared: 09-20-2018 <br />Equipment Tag(s)' J; RTU -01 RTU -02 <br />MANDATORY MEASURES T-24 Sections Requirement As Schedule Requirement As Scheduled3 Requirement As Schedule <br />Heating Equipment Efficiency 110.1 or 110.2(a) 0.81 0.81 0.81 0.81 <br />Cooling Equipment Efficiency¢ 110.1 or 110.2(a) 11 EER 11EER 11 EER 11 EER <br />Thermostats$ 110.2(b), 110.2(c) REQUIRED SETBACK REQUIRED SETBACK <br />Furnace Standby Loss Control 110.2(d) NOT REQUIRED N/A NOT REQUIRED N/A <br />Low Leakage AHU 110.2(f) NOT REQUIRED N/A NOT REQUIRED N/A <br />Ventilation? 120.1(b) 543.5 545 432.6 435 <br />Demand Control Ventilation$ 120.1(c)4 NOT REQUIRED N/A NOT REQUIRED N/A <br />Occupant Sensor Ventilation Control$ 120.1(c)5, 120.2(e)3 NOT REQUIRED N/A NOT REQUIRED N/A <br />Shutoff and Reset Controls' 120.2(e) REQUIRED SCHEDULED REQUIRED SCHEDULED <br />Outdoor Air and Exhaust Damper Control 120.2(f) REQUIRED AUTO REQUIRED AUTO <br />Automatic Demand Shed Controls 120.2(h) NOT REQUIRED N/A NOT REQUIRED N/A <br />Economizer FDD 120.2(1) NOT REQUIRED N/A NOT REQUIRED N/A <br />Duct Insulation 120.4 R-6 R-8 R 6 R-8 <br />PRESCRIPTIVE MEASURES <br />Equipment is sized in conformance with 140.4(a & b) REQUIRED YES REQUIRED YES <br />140.4(a&b) <br />Economizer 140.4(e) NOT REQUIRED N/A NOT REQUIRED N/A <br />Electric Resistance Heating10 140.4(8) N/A N/A N/A N/A <br />Duct Leakage Sealing and Testing." 140.4(1) NOT REQUIRED N/A NOT REQUIRE❑ N/A <br />Notes: <br />1. i'rovide equipment tags (e.g. AC1 or AC1 to 10). Multiple units of the same make and model with the same application and accessories can be grouped together. <br />2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessories); Description of the unit (e.g. gas -pack or heatpump; rated heating capacity <br />(enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no cooling). For unit capacities include the units (e.g. kBtuh or tons). <br />3. For each requirement, enter the minimum requirement from the Standard in the left column (under Standard Requirement"). in the right column (under "As Scheduled') enter the value for <br />the units as specified. <br />4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and iEER). <br />5. in the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), . in the right column indicate the <br />capabilities of the thermostat as scheduled. <br />G. if the unit has a furnace which is rated at? 225,000 ittuh of capacity, indicate the rated standby loss and ignition source (e.g. iiD). if there Is no furnace or the unit is rated for :225,000 ittuh <br />indicate "NIA". <br />7. in the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfrolperson. in the right column enter the actual minimum <br />ventilation as scheduled. if the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. <br />S. if the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). if either DCV or Occupant <br />Sensor Ventilation Control is provided indicate `provided" in the right column (otherwise indicate "N/A" in the right column) <br />9. in the left column indicate the required time controls from the standard. in the right column identify the device that provides this functionality (e.g. EMCS or programmable timedock). <br />10. Enter N/A if there is no electric heating. if the system has electric heating indicate which exception to 140.4(8) applies. <br />11. if duct leakage sealing acrd testing is required, a MCH- 04-A compliance document utast be submitted. <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 <br />0 <br />Lu <br />Lu <br />U) <br />LLI <br />W <br />U) <br />J <br />J <br />Q <br />J <br />STATE OF CALIFORNIA <br />REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS <br />W <br />'EC-NRCC-MCH-05-E (Revised 01116) CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E <br />Requirements for Packaged 5ingle-Zone Units (Page 2 of 2) <br />Pr°iefrName:85C BakeryStockton- Tenant Improvement Date Prepared: C9-20-2018 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. 1 certify that this Certificate of Compliance documentation is accurate and complete. <br />Documentation Author Name: Jia Hui Pan <br />Documentation Author Signature: <br />company. JHP Engineering and Design Services, Inc. <br />Signature Date: 09-20-2018 <br />Address: 3119 Central Parkway <br />CEA/ -HERS Certificationldentification (if applicable): <br />city/state/Zip: DUBLIN / CA / 94568 <br />P"°ne1 510-468-0613 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />I certify the following under penalty of'pe. rjury, under the. laws of the State of Cal ifnrnia: <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance {responsible <br />designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance <br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, <br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. <br />S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement <br />agency for all applicable inspections. I understand that a completedsigned copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the <br />building owner at occupancy. <br />Responsible Designer Name: Jia Hui Pan <br />Responsible Designer Signature: <br />Company: JHP Engineering and Design Services, Inc. <br />Date Signed: 09-20-2018 <br />Address: 3119 Central Parkway <br />License: M35374 <br />Cty/State/lip! DUBLIN / CA / 94568 <br />Phone: 510-468-0613 <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance <br />January 2016 <br />STATE OF CALIFORNIA <br />WATER HEATING SYSTEM GENERAL INFORMATION <br />CEC-NRCC-PLB-01-E (Revised 01116) CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-PLB-01-E <br />Water Heating System General Information (Page.1 of 2) <br />Pr°'e`tNamff. 85.0 Bakery Stockton - Tenant Improvement Date Pre pared: 020-2018 <br />A. GENERAL <br />INFORMATION/SYSTEM INFORMATION <br />01 <br />Water Heater System Name: <br />M-01 <br />02 <br />Water Heater System Configuration: <br />Central System <br />03 <br />Water Heater System Type: <br />Domestic Hot Water <br />04 <br />Building Type: <br />Nonresidential <br />05 <br />Total Number of Water Heaters in Systems: <br />1 <br />06 <br />Central DHW Distribution Type: <br />Demand Recirculation <br />07 <br />Dwelling Unit DHW Distribution Type: <br />Standard Distribution System (STD) <br />B. WATER HEATER INFORMATION <br />Each water heater type requires a separate compliance document. <br />01 <br />Water Heater Type: <br />Small Storage - Gas <br />02 <br />Fuel Type: <br />Gas <br />03 <br />Manufacture Name: <br />American Standard Commercial Ultra Low Nox <br />04 <br />Model Number: <br />ULN-80-125-AS <br />05 <br />Number of Identical Water Heaters: <br />1 <br />06 <br />Installed Water Heater System Efficiency: <br />80% <br />07 <br />Required Minimum Efficiency: <br />80% <br />08 <br />Standby Loss Percent or Standby Loss Total: <br />0.2% <br />09 <br />Rated Input: <br />125,000 btu/h <br />10 <br />Pilot Energy: <br />Zero <br />11 <br />Water Heater Tank Storage Volume: <br />80 Gallon <br />12 <br />Exterior Insulation on Water Heater: <br />None. Factory internally insulated <br />13 <br />Volume of Supplemental Storage: <br />None <br />14 <br />Internal Insulation on Supplemental Storage: <br />None <br />15 <br />Exterior Insulation on Supplemental Storage: <br />None <br />C. PLUMBING COMPLIANCE FORMS & WORKSHEETS <br />Check box if worksheet is included. <br />For detailed instructions on the use of this and all Energy Standards compliance documents, refer to the 2016 !Nonresidential Manual <br />!Vote: The Enforcement Agency may require all compliance documents to be incorporated onto the building plans. <br />YES <br />NO <br />Doc/Worksheet # <br />'ritle <br />CO) <br />C) <br />NRCC-PLB-01-E <br />Certificate of Compliance, Declaration. Required on plans for all submittals. <br />0 <br />CO) <br />NRCI-PLB-01-E <br />Certificate of Installation. Req uired on plans for all submittals. <br />0 <br />CO) <br />NRCI-PLB-02-E <br />Certificate of Installation, required on central systems in high-rise residential, <br />the enforcement agency for approval with this building permit application. <br />5. 1 will ensure that a completed signed copyof this Certificate of Com liance shall be made available with the building permit(s) <br />) <br />issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed <br />hotel/motel application. <br />owner at occupancy. <br />Responsible Designer Name: Jia Hui Pan <br />NRCI-PLB-03-E <br />Certificate of Installation, required on single dwelling unit systems in high-rise <br />Datesigned: 09-20-2018 <br />Address: 3119 Central Parkway <br />License: M35374 <br />residential, hotel/motel application. <br />0 <br />Q <br />NRCI-PLB-21-H <br />Certificate of Installation, required on HERS verified central systems in high-rise <br />Qz <br />residential, hotel/motel application. <br />0 <br />CO) <br />NRCI-PLB-22-H <br />Certificate of Installation, required on HERS verified single dwelling unit systems in high- <br />V <br />z <br />rise residential, hoteVmote I application. <br />0 <br />NRCI-STH-01-E <br />lCertificate of Installation, required on any solar water heating <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance <br />STATE OF CALIFORNIA <br />WATER HEATING SYSTEM GENERAL INFORMATION <br />CEC-NRCC-PLB-01-E (Revised 01116) <br />January 2016 <br />CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-PLB-01-E <br />Water Heating System General Information (Page.2 of 2) <br />Pr oj ect Name 85.0 Bakery Stockton - Tenant Improvement Date Prepared: 09-20-2018 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. I certify that this Certificate of Compliance documentation is accurate and complete. <br />DocumentationAuthor Name:Jla Hui Pan <br />DocumentationAuthor S.ignat <br />company: JHP Engineering and Design Services, Inc. <br />signature Date:09-20-2018 <br />Address: 3119 Central Parkway <br />CEA/ HERS Certification Identification (if applicable): <br />City/State/Zip: Dublin / CA / 94568 <br />Phone: 510-468-0613 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />I certify the following under penalty of perjury, under the laws of the State of California: <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system des'Ign <br />identified on this Certificate of Compliance (responsible designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or <br />system design identified on this Certificate of Com pliance.conform to the. requirements of Title 24, Part 1 and Part 6 of the <br />California Code of Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistentwith the <br />information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to <br />the enforcement agency for approval with this building permit application. <br />5. 1 will ensure that a completed signed copyof this Certificate of Com liance shall be made available with the building permit(s) <br />) <br />issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed <br />signed co of this Certificate of Com liance is require to be included with the.documentation the. builder provide to the buildin <br />g copy p q p g <br />owner at occupancy. <br />Responsible Designer Name: Jia Hui Pan <br />Responsible Designersignature; <br />Company: JHP Engineering and Design Services, Inc. <br />Datesigned: 09-20-2018 <br />Address: 3119 Central Parkway <br />License: M35374 <br />City/State/Zip: Dublin / CA / 94568 <br />Phone: 510-468-0613 <br />CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance <br />January 2016 <br />E -In :11 n ol�1Y�i11rmi n <br />Sje�rw (r; -,j IrJJcJ � <br />ADR: <br />3119 Central Parkway, <br />Dublin CA. 94568 <br />TEL: <br />510-788-6029 <br />CEL: <br />510-468-0613 <br />FAX: <br />510-788-6039 <br />I Revisions I Date I <br />PROGRESS REVIEW 10-01-2018 <br />PERMIT SET 10-29-2018 <br />Preliminary Set <br />Design Review Set <br />Plan Check Set X <br />Plan Check Resubmit <br />Construction Set <br />1 <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />MECHANICAL <br />PRESCRIPTIVE TITLE <br />24 COMPLIANCE <br />of: ME -0.6 <br />U) <br />LU <br />Z <br />� <br />� <br />LLJ <br />J <br />C:) <br />Lo <br />Lu <br />O <br />rn <br />Q <br />O <br />Q <br />MW <br />� <br />z <br />U <br />Qz <br />° <br />V <br />z <br />m <br />Liw <br />Q <br />U <br />U.)0 <br />00 <br />F___o <br />cn <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />MECHANICAL <br />PRESCRIPTIVE TITLE <br />24 COMPLIANCE <br />of: ME -0.6 <br />