0
<br />w
<br />Lu
<br />co
<br />W
<br />to
<br />J
<br />J
<br />Q
<br />Phone: 510-468-0613 A. Mechanical Ventilation and Reheat
<br />In lieu of this compliance document the required outdoor ventilation rates and airflows may be shown on the tans or the calculations can be resented in a spreadsheet. Mechanical Ventilation and
<br />Y P P P
<br />Reheat worksheet available on the Ener Commission's website at: htt www.ener .ca. ov title24 2016standards .
<br />Energy
<br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br />1. Icertify that this Certificate of Compliance documentation is accurate and complete.
<br />P
<br />Documentation Author Name:
<br />Jia Hui Pan
<br />Documentation Author Signature:
<br />Company: JHP Engineering and Design Services Inc.
<br />signature Date: 09-20-2018
<br />Address: 3119 Central Parkway
<br />CEA/ HERS Certification Identification (if applicable}:
<br />City/State/Zip: Dublin / CA/ 94568
<br />Phone: 510-468-0613
<br />STATE OF CALIFORNIA
<br />HVAC SYSTEM REQUIREMENTS
<br />STATE OF CALIFORNIA
<br />MECHANICAL VENTILATION AND REHEAT
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />Mmj
<br />STATE OF CALIFORNIA
<br />REQUIRED ACCEPTANCE TESTSh' ;=
<br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
<br />design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
<br />Regulations.
<br />CEC-NRCC-MCH-02-E .(Revised 01116) CALIFORNIA ENERGY COMMISSION `ir
<br />CEC-NRCC-MCH-03E (Revised 05/16)
<br />CALIFORNIA ENERGY COMMISSION 130w
<br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permits}issued for the
<br />CEC-NRCC-MCH-04-E (Revised 01116) CALIFORNIA ENERGY COMMISSION �w
<br />Certificate of Compliance is required to be included -with the documentation the builder provides to the building owner at occupancy.
<br />Responsible Designer Name:
<br />Jia Hui Pan
<br />Responsible Designer Signature:
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
<br />CERTIFICATE OF COMPLIANCE
<br />Address: 3119 Central Parkway
<br />NRCC-MCH-03-E
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E
<br />Phone:
<br />510-465-0613
<br />Demand
<br />BASIS
<br />HVAC Wet System Requirements (Page 3 of 3)
<br />Mechanical Ventilation & Reheat
<br />Distributed
<br />Page 1 of 2
<br />Required Acceptance Tests Pagel of 3
<br />02
<br />03
<br />04
<br />Project Name: 85C Bakery Stockton -Tenant Improvement 09-20-2018 Date Prepared:
<br />ProjectName: 85C Bakery Stockton -Tenant Improvement
<br />Date Prepared: 09-20-2018
<br />08
<br />09
<br />ProjectName: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2015
<br />11
<br />12
<br />13
<br />14
<br />15
<br />16
<br />17
<br />18
<br />19
<br />20
<br />Hrp7earn,
<br />m
<br />3
<br />o
<br />Management
<br />0
<br />EJn1 1nii�
<br />w
<br />w
<br />Unitary
<br />a
<br />Controls
<br />a
<br />J
<br />\ �1
<br />� l n r 1 r l r /1 1 I_ n—
<br />an De 1� n
<br />�JJ
<br />o
<br />Packaged
<br />a
<br />a
<br />Test Performed By:
<br />-..JJJ ...J J ���
<br />a
<br />�
<br />a�
<br />>
<br />a
<br />S e�rw cJa�S Irn cJ
<br />.JJ —%&%w JJJ.�J
<br />�
<br />�
<br />a
<br />w
<br />�
<br />ADR: 3119 Central Parkway,
<br />�
<br />o
<br />LL
<br />��
<br />w
<br />Dublin CA. 94568
<br />�
<br />AC Systems
<br />System
<br />LL
<br />TEL: 510-788-6029
<br />�
<br />�
<br />�
<br />�
<br />�
<br />o
<br />CEL: 510-468-0613
<br />�
<br />RTU -02
<br />1
<br />FAX: 510-788-6039
<br />Z
<br />y
<br />a
<br />w
<br />CUJ
<br />QROFESS/0
<br />Q
<br />�
<br />w
<br />�
<br />w
<br />C�z��
<br />C l_7
<br />T Q C
<br />�¢ C
<br />C_
<br />T Q C
<br />O
<br />l? 9
<br />Z
<br />Q C
<br />H
<br />J
<br />Z (7
<br />Z
<br />�
<br />J
<br />O
<br />O
<br />C9
<br />M353 4 rri
<br />J
<br />W Q
<br />H H
<br />LL LL
<br />z� U
<br />LL O LL
<br />z Z�
<br />LL LL
<br />Z t7 U
<br />J�
<br />6/30/19 y�
<br />� $
<br />cc
<br />G
<br />cc
<br />LL
<br />O
<br />K
<br />W
<br />m
<br />C
<br />LL
<br />W U
<br />0c_
<br />�-%
<br />C LL
<br />� U
<br />0c_
<br />U
<br />LL
<br />K
<br />dc
<br />O}
<br />0
<br />G
<br />G
<br />C
<br />w
<br />wo
<br />w �
<br />wa
<br />z
<br />a
<br />z
<br />z
<br />�
<br />�
<br />�
<br />z_
<br />Revisions
<br />Date
<br />¢
<br />u
<br />u
<br />D O
<br />O w
<br />PROGRESS REVIEW
<br />10-01-2018
<br />z
<br />z
<br />O
<br />PERMIT SET
<br />10-29-2018
<br />�
<br />o�
<br />�
<br />Z
<br />p
<br />�
<br />u
<br />z
<br />Z
<br />�
<br />w
<br />cn
<br />�
<br />Add Row Remove Last.
<br />O
<br />ri
<br />Preliminary Set
<br />Design Review Set
<br />¢
<br />m
<br />o_
<br />Plan Check Set
<br />X
<br />�.
<br />560
<br />0.15
<br />84
<br />Plan Check Resubmit
<br />15
<br />Construction Set
<br />84
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016
<br />PASS.
<br />CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance
<br />May 2016
<br />STATE OF CALIFORNIA
<br />STATE OF CALIFORNIA
<br />�
<br />MECHANICAL VENTILATION AND REHEAT
<br />253
<br />0.15
<br />>i
<br />REQUIRED ACCEPTANCE TESTS" b
<br />15
<br />15
<br />CEC-NRCC-MCH-03-E (Revised 05/16)
<br />CALIFORNIA ENERGY COMMISSION ��
<br />PASS
<br />CEC-NRCC-MCH-04-E (Revised 01116) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE
<br />NRCC-MCH-03-E
<br />DINING
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E
<br />Mechanical Ventilation & Reheat
<br />Page 2 of 2
<br />0.5
<br />Required Acceptance Tests Page 2 of 3
<br />28
<br />15
<br />Project Name. 85C Bakery Stockton -Tenant Improvement
<br />Cate Prepared: 09-20-2018
<br />420
<br />PASS
<br />ProjectName: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2015
<br />RTU -01
<br />�
<br />18
<br />543.5
<br />545
<br />PASS
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016
<br />KITCHEN
<br />�
<br />784
<br />0.15
<br />117.6
<br />4
<br />15
<br />60
<br />117.6
<br />120
<br />PASS
<br />RESTROQpi
<br />i
<br />�
<br />161
<br />0.15
<br />24.2
<br />O
<br />15
<br />30
<br />30
<br />30
<br />PASS
<br />DINING
<br />282
<br />0.5
<br />14.1
<br />19
<br />15
<br />285
<br />285
<br />285
<br />PASS
<br />RTU -02
<br />V
<br />432.6
<br />435
<br />PASS
<br />O
<br />Add Row Remove Last
<br />1
<br />Z Q �
<br />LU
<br />w �
<br />LU
<br />=
<br />Q
<br />ON Q
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016
<br />L.1_ Z U
<br />CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance
<br />May 2016
<br />a_ G
<br />Z
<br />O
<br />V z
<br />O Q m U
<br />Z 0
<br />`�
<br />co � 00 Cn
<br />Scale: AS NOTED
<br />Drawn By: AL
<br />Approved By: JP
<br />Job: 18033
<br />Sheet:
<br />MECHANICAL
<br />PRESCRIPTIVE TITLE
<br />24 COMPLIANCE
<br />of: ME=Om5
<br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br />1. Icertify that this Certificate of Compliance documentation is accurate and complete.
<br />P
<br />Documentation Author Name:
<br />Jia Hui Pan
<br />Documentation Author Signature:
<br />Company: JHP Engineering and Design Services Inc.
<br />signature Date: 09-20-2018
<br />Address: 3119 Central Parkway
<br />CEA/ HERS Certification Identification (if applicable}:
<br />City/State/Zip: Dublin / CA/ 94568
<br />Phone: 510-468-0613
<br />RESPONSIBLE PERSON'S DECLARATION STATEMENT
<br />I certify the following under penalty of perjury, under the laws of the State of California:
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design g Y g
<br />identified on this Certificate of Compliance (responsible designer).
<br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
<br />design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
<br />Regulations.
<br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
<br />provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
<br />agency for approval with this building permit application.
<br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permits}issued for the
<br />building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this
<br />Certificate of Compliance is required to be included -with the documentation the builder provides to the building owner at occupancy.
<br />Responsible Designer Name:
<br />Jia Hui Pan
<br />Responsible Designer Signature:
<br />Company: JHP Engineering and Design Services Inc.
<br />Date Signed: 09-20-2018
<br />Address: 3119 Central Parkway
<br />License: M35374
<br />City/state/zip: Dublin/CA/94568
<br />Phone:
<br />510-465-0613
<br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br />1. I certify that this Certificate of Compliance documentation is accurate and complete.
<br />P // gY g / / /
<br />Note: In all of the calculations that compare a supply quantity to the REQ'D V.A. quantity, the actual percentage of outdoor air in the supply is ignored.
<br />Areas in buildings for which natural ventilation is used should be clearly designated. Specifications must require that building operating instructions include explanations of the natural ventilation
<br />system.
<br />ACTUAL DESIGN (FROM EQUIPMENT
<br />CEA/ HERS Certification Identification [if applicable]:
<br />Cty/State/Zip:
<br />Dublin / CA / 94568
<br />Phone,
<br />510-465-0613
<br />RESPONSIBLE PERSON'S DECLARATION STATEMENT
<br />ROOM
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />VAV REHEATED
<br />designer).
<br />VAV DEADBAND
<br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
<br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
<br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
<br />AREA BASIS
<br />OCCUPANCY BASIS
<br />Responsible Designer Name:
<br />MINIMUM
<br />Jia Hui Pan
<br />Company,
<br />JHP Engineering and Design Services, Inc.
<br />Date Signed:
<br />09-20-2015
<br />SCHEDULES, ETC]
<br />Lioense:M35374
<br />City/State/Zip_
<br />Dublin / CA / 94565
<br />Phone:
<br />510-465-0613
<br />Demand
<br />BASIS
<br />Automatic
<br />PRIMARY AIR CFM
<br />Distributed
<br />PRIMARY AIR CFM
<br />01
<br />02
<br />03
<br />04
<br />b5
<br />06
<br />07
<br />08
<br />09
<br />10
<br />11
<br />12
<br />13
<br />14
<br />15
<br />16
<br />17
<br />18
<br />19
<br />20
<br />21
<br />m
<br />3
<br />o
<br />Management
<br />0
<br />3
<br />w
<br />w
<br />Unitary
<br />a
<br />Controls
<br />a
<br />�
<br />o
<br />Packaged
<br />a
<br />a
<br />Test Performed By:
<br />a
<br />a
<br />�
<br />a�
<br />>
<br />a
<br />>�
<br />a�
<br />�
<br />�
<br />a
<br />w
<br />�
<br />z
<br />o
<br />�
<br />o
<br />LL
<br />��
<br />w
<br />�
<br />AC Systems
<br />System
<br />LL
<br />1
<br />�
<br />�
<br />�
<br />�
<br />�
<br />o
<br />�I
<br />�
<br />RTU -02
<br />1
<br />Z
<br />y
<br />a
<br />w
<br />CUJ
<br />Q
<br />�
<br />w
<br />�
<br />w
<br />C�z��
<br />C l_7
<br />T Q C
<br />�¢ C
<br />C_
<br />T Q C
<br />O
<br />m
<br />Q C
<br />H
<br />J
<br />Z (7
<br />Z
<br />�
<br />J
<br />O
<br />O
<br />O
<br />J
<br />W Q
<br />H H
<br />LL LL
<br />z� U
<br />LL O LL
<br />z Z�
<br />LL LL
<br />Z t7 U
<br />J�
<br />K LL
<br />W U
<br />� $
<br />cc
<br />G
<br />cc
<br />LL
<br />O
<br />K
<br />W
<br />m
<br />C
<br />LL
<br />W U
<br />0c_
<br />�-%
<br />C LL
<br />� U
<br />0c_
<br />U
<br />LL
<br />K
<br />dc
<br />O}
<br />G
<br />G
<br />C
<br />w
<br />wo
<br />w �
<br />wa
<br />z
<br />a
<br />z
<br />z
<br />�
<br />�
<br />�
<br />z_
<br />u
<br />O
<br />¢
<br />u
<br />u
<br />D O
<br />O w
<br />D=
<br />O
<br />z
<br />z
<br />O
<br />�
<br />o�
<br />�
<br />Z
<br />p
<br />�
<br />u
<br />z
<br />Z
<br />�
<br />w
<br />cn
<br />�
<br />—
<br />z
<br />O
<br />ri
<br />�
<br />z
<br />¢
<br />m
<br />o_
<br />KITCHEN
<br />�.
<br />560
<br />0.15
<br />84
<br />3
<br />15
<br />45
<br />84
<br />85
<br />PASS.
<br />�.
<br />STORAGE
<br />�
<br />253
<br />0.15
<br />39.5
<br />1
<br />15
<br />15
<br />39.5
<br />40
<br />PASS
<br />DINING
<br />�
<br />420
<br />0.5
<br />215
<br />28
<br />15
<br />420
<br />420
<br />420
<br />PASS
<br />RTU -01
<br />�
<br />18
<br />543.5
<br />545
<br />PASS
<br />KITCHEN
<br />�
<br />784
<br />0.15
<br />117.6
<br />4
<br />15
<br />60
<br />117.6
<br />120
<br />PASS
<br />RESTROQpi
<br />i
<br />�
<br />161
<br />0.15
<br />24.2
<br />2
<br />15
<br />30
<br />30
<br />30
<br />PASS
<br />DINING
<br />282
<br />0.5
<br />14.1
<br />19
<br />15
<br />285
<br />285
<br />285
<br />PASS
<br />RTU -02
<br />25
<br />432.6
<br />435
<br />PASS
<br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br />1. I certify that this Certificate of Compliance documentation is accurate and complete.
<br />Documentation Author Name:.
<br />Jia Hui Pan
<br />Documentation Author Signature:
<br />Company,
<br />JHP Engineering and Design Services, Inc.
<br />Signature Date,
<br />09-20-2015
<br />Address 3119 Central Parkway
<br />CEA/ HERS Certification Identification [if applicable]:
<br />Cty/State/Zip:
<br />Dublin / CA / 94568
<br />Phone,
<br />510-465-0613
<br />RESPONSIBLE PERSON'S DECLARATION STATEMENT
<br />I certify the following under penalty of perjury, under the laws of the State of California:
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
<br />designer).
<br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
<br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
<br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
<br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
<br />agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the
<br />building owner at occupancy.
<br />Responsible Designer Name:
<br />Responsible Designer Signature:
<br />Jia Hui Pan
<br />Company,
<br />JHP Engineering and Design Services, Inc.
<br />Date Signed:
<br />09-20-2015
<br />Address3119 Central Parkway
<br />Lioense:M35374
<br />City/State/Zip_
<br />Dublin / CA / 94565
<br />Phone:
<br />510-465-0613
<br />A. MECHANICAL COMPLIANCE FORMS 8e WORKSHEETS
<br />(indicate if worksheet is included)
<br />For detailed instructions on the use of this and all Energy Standards compliance documents, refer to the 2016 Nonresidential Manual
<br />Note: The Enforcement Agency may require all compliance documents to 6e incorporated onto the building plans. The NRCC MCH 04 E and NRCC MCH 05 E are alternative
<br />compliance documents to NRCC-MCH-01-E, NRCC-MCH-02-E and NRCC-MCH-03-E for projects using only single zone packaged HVACsystems.
<br />YES
<br />NO
<br />Form
<br />Title
<br />�
<br />person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
<br />NRCC-MCH-04-E (1 of 2)
<br />Certificate of Compliance. Required on plans when used.
<br />The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy.
<br />Test Description
<br />NRCC-MCH-04-E (2 of 2)
<br />Mechanical Acceptance Tests. Required on plans when used.
<br />MCH -04-A
<br />MCH -05-A
<br />NRCC-MCH-05-E (1 of 2)
<br />HVAC Prescriptive Requirements. It is required on plans when used.
<br />MCH -11-A
<br />(:
<br />NRCC-MCH-05-E (2 of 2)
<br />Mechanical 5WH Equipment Summary is required for all submittals with service water heating, pools or spas. It is
<br />required on plans where applicable.
<br />Designer:
<br />This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
<br />check the applicable boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
<br />equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the
<br />test. Since this compliance document will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
<br />Enforcement Agency:
<br />Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
<br />normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
<br />Systems Acceptance. Before occupancy permit is granted all newly installed HVAC equipment must be tested using the Acceptance Requirements. The NRCC-MCH-04-E compliance
<br />document is not considered a completed document and is not to be accepted b the building department unless the correct boxes are checked. Theequipment re uirin testing,
<br />Y g q g g.
<br />person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
<br />checked -off forms are required for ALL new! installed and replaced equipment. In addition a Certificate of Acceptance compliance documents shall be submitted to the building
<br />Y g
<br />department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6.
<br />The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy.
<br />Test Description
<br />MCH -02-A
<br />MCH -03-A
<br />MCH -04-A
<br />MCH -05-A
<br />MCH -06-A
<br />MCH -07-A
<br />MCH -11-A
<br />MCH -12-A
<br />MCH -14-A
<br />MCH -18-A
<br />Demand
<br />Automatic
<br />Distributed
<br />Ener �
<br />Equipment
<br />Air
<br />FDD for
<br /># of
<br />Outdoor
<br />Single Zone
<br />Economizer
<br />Control
<br />Supply Fan
<br />Demand
<br />Energy
<br />Management
<br />Requiring Testing
<br />Units
<br />Air
<br />Unitary
<br />Distribution
<br />Controls
<br />Ventilation
<br />VAV
<br />Shed
<br />Packaged
<br />Storage DX
<br />Control
<br />Test Performed By:
<br />or Verification
<br />Ducts
<br />DX Units
<br />(DCV)
<br />Control
<br />AC Systems
<br />System
<br />RTU -01
<br />1
<br />�
<br />�
<br />�
<br />�
<br />�
<br />�
<br />�I
<br />RTU -02
<br />1
<br />
|