Laserfiche WebLink
0 <br />w <br />Lu <br />co <br />W <br />to <br />J <br />J <br />Q <br />Phone: 510-468-0613 A. Mechanical Ventilation and Reheat <br />In lieu of this compliance document the required outdoor ventilation rates and airflows may be shown on the tans or the calculations can be resented in a spreadsheet. Mechanical Ventilation and <br />Y P P P <br />Reheat worksheet available on the Ener Commission's website at: htt www.ener .ca. ov title24 2016standards . <br />Energy <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. Icertify that this Certificate of Compliance documentation is accurate and complete. <br />P <br />Documentation Author Name: <br />Jia Hui Pan <br />Documentation Author Signature: <br />Company: JHP Engineering and Design Services Inc. <br />signature Date: 09-20-2018 <br />Address: 3119 Central Parkway <br />CEA/ HERS Certification Identification (if applicable}: <br />City/State/Zip: Dublin / CA/ 94568 <br />Phone: 510-468-0613 <br />STATE OF CALIFORNIA <br />HVAC SYSTEM REQUIREMENTS <br />STATE OF CALIFORNIA <br />MECHANICAL VENTILATION AND REHEAT <br />1. The information provided on this Certificate of Compliance is true and correct. <br />Mmj <br />STATE OF CALIFORNIA <br />REQUIRED ACCEPTANCE TESTSh' ;= <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system <br />design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of <br />Regulations. <br />CEC-NRCC-MCH-02-E .(Revised 01116) CALIFORNIA ENERGY COMMISSION `ir <br />CEC-NRCC-MCH-03E (Revised 05/16) <br />CALIFORNIA ENERGY COMMISSION 130w <br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permits}issued for the <br />CEC-NRCC-MCH-04-E (Revised 01116) CALIFORNIA ENERGY COMMISSION �w <br />Certificate of Compliance is required to be included -with the documentation the builder provides to the building owner at occupancy. <br />Responsible Designer Name: <br />Jia Hui Pan <br />Responsible Designer Signature: <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E <br />CERTIFICATE OF COMPLIANCE <br />Address: 3119 Central Parkway <br />NRCC-MCH-03-E <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E <br />Phone: <br />510-465-0613 <br />Demand <br />BASIS <br />HVAC Wet System Requirements (Page 3 of 3) <br />Mechanical Ventilation & Reheat <br />Distributed <br />Page 1 of 2 <br />Required Acceptance Tests Pagel of 3 <br />02 <br />03 <br />04 <br />Project Name: 85C Bakery Stockton -Tenant Improvement 09-20-2018 Date Prepared: <br />ProjectName: 85C Bakery Stockton -Tenant Improvement <br />Date Prepared: 09-20-2018 <br />08 <br />09 <br />ProjectName: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2015 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />Hrp7earn, <br />m <br />3 <br />o <br />Management <br />0 <br />EJn1 1nii� <br />w <br />w <br />Unitary <br />a <br />Controls <br />a <br />J <br />\ �1 <br />� l n r 1 r l r /1 1 I_ n— <br />an De 1� n <br />�JJ <br />o <br />Packaged <br />a <br />a <br />Test Performed By: <br />-..JJJ ...J J ��� <br />a <br />� <br />a� <br />> <br />a <br />S e�rw cJa�S Irn cJ <br />.JJ —%&%w JJJ.�J <br />� <br />� <br />a <br />w <br />� <br />ADR: 3119 Central Parkway, <br />� <br />o <br />LL <br />�� <br />w <br />Dublin CA. 94568 <br />� <br />AC Systems <br />System <br />LL <br />TEL: 510-788-6029 <br />� <br />� <br />� <br />� <br />� <br />o <br />CEL: 510-468-0613 <br />� <br />RTU -02 <br />1 <br />FAX: 510-788-6039 <br />Z <br />y <br />a <br />w <br />CUJ <br />QROFESS/0 <br />Q <br />� <br />w <br />� <br />w <br />C�z�� <br />C l_7 <br />T Q C <br />�¢ C <br />C_ <br />T Q C <br />O <br />l? 9 <br />Z <br />Q C <br />H <br />J <br />Z (7 <br />Z <br />� <br />J <br />O <br />O <br />C9 <br />M353 4 rri <br />J <br />W Q <br />H H <br />LL LL <br />z� U <br />LL O LL <br />z Z� <br />LL LL <br />Z t7 U <br />J� <br />6/30/19 y� <br />� $ <br />cc <br />G <br />cc <br />LL <br />O <br />K <br />W <br />m <br />C <br />LL <br />W U <br />0c_ <br />�-% <br />C LL <br />� U <br />0c_ <br />U <br />LL <br />K <br />dc <br />O} <br />0 <br />G <br />G <br />C <br />w <br />wo <br />w � <br />wa <br />z <br />a <br />z <br />z <br />� <br />� <br />� <br />z_ <br />Revisions <br />Date <br />¢ <br />u <br />u <br />D O <br />O w <br />PROGRESS REVIEW <br />10-01-2018 <br />z <br />z <br />O <br />PERMIT SET <br />10-29-2018 <br />� <br />o� <br />� <br />Z <br />p <br />� <br />u <br />z <br />Z <br />� <br />w <br />cn <br />� <br />Add Row Remove Last. <br />O <br />ri <br />Preliminary Set <br />Design Review Set <br />¢ <br />m <br />o_ <br />Plan Check Set <br />X <br />�. <br />560 <br />0.15 <br />84 <br />Plan Check Resubmit <br />15 <br />Construction Set <br />84 <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 <br />PASS. <br />CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance <br />May 2016 <br />STATE OF CALIFORNIA <br />STATE OF CALIFORNIA <br />� <br />MECHANICAL VENTILATION AND REHEAT <br />253 <br />0.15 <br />>i <br />REQUIRED ACCEPTANCE TESTS" b <br />15 <br />15 <br />CEC-NRCC-MCH-03-E (Revised 05/16) <br />CALIFORNIA ENERGY COMMISSION �� <br />PASS <br />CEC-NRCC-MCH-04-E (Revised 01116) CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE <br />NRCC-MCH-03-E <br />DINING <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E <br />Mechanical Ventilation & Reheat <br />Page 2 of 2 <br />0.5 <br />Required Acceptance Tests Page 2 of 3 <br />28 <br />15 <br />Project Name. 85C Bakery Stockton -Tenant Improvement <br />Cate Prepared: 09-20-2018 <br />420 <br />PASS <br />ProjectName: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2015 <br />RTU -01 <br />� <br />18 <br />543.5 <br />545 <br />PASS <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 <br />KITCHEN <br />� <br />784 <br />0.15 <br />117.6 <br />4 <br />15 <br />60 <br />117.6 <br />120 <br />PASS <br />RESTROQpi <br />i <br />� <br />161 <br />0.15 <br />24.2 <br />O <br />15 <br />30 <br />30 <br />30 <br />PASS <br />DINING <br />282 <br />0.5 <br />14.1 <br />19 <br />15 <br />285 <br />285 <br />285 <br />PASS <br />RTU -02 <br />V <br />432.6 <br />435 <br />PASS <br />O <br />Add Row Remove Last <br />1 <br />Z Q � <br />LU <br />w � <br />LU <br />= <br />Q <br />ON Q <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 <br />L.1_ Z U <br />CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance <br />May 2016 <br />a_ G <br />Z <br />O <br />V z <br />O Q m U <br />Z 0 <br />`� <br />co � 00 Cn <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />MECHANICAL <br />PRESCRIPTIVE TITLE <br />24 COMPLIANCE <br />of: ME=Om5 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. Icertify that this Certificate of Compliance documentation is accurate and complete. <br />P <br />Documentation Author Name: <br />Jia Hui Pan <br />Documentation Author Signature: <br />Company: JHP Engineering and Design Services Inc. <br />signature Date: 09-20-2018 <br />Address: 3119 Central Parkway <br />CEA/ HERS Certification Identification (if applicable}: <br />City/State/Zip: Dublin / CA/ 94568 <br />Phone: 510-468-0613 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />I certify the following under penalty of perjury, under the laws of the State of California: <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design g Y g <br />identified on this Certificate of Compliance (responsible designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system <br />design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of <br />Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information <br />provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement <br />agency for approval with this building permit application. <br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permits}issued for the <br />building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this <br />Certificate of Compliance is required to be included -with the documentation the builder provides to the building owner at occupancy. <br />Responsible Designer Name: <br />Jia Hui Pan <br />Responsible Designer Signature: <br />Company: JHP Engineering and Design Services Inc. <br />Date Signed: 09-20-2018 <br />Address: 3119 Central Parkway <br />License: M35374 <br />City/state/zip: Dublin/CA/94568 <br />Phone: <br />510-465-0613 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. I certify that this Certificate of Compliance documentation is accurate and complete. <br />P // gY g / / / <br />Note: In all of the calculations that compare a supply quantity to the REQ'D V.A. quantity, the actual percentage of outdoor air in the supply is ignored. <br />Areas in buildings for which natural ventilation is used should be clearly designated. Specifications must require that building operating instructions include explanations of the natural ventilation <br />system. <br />ACTUAL DESIGN (FROM EQUIPMENT <br />CEA/ HERS Certification Identification [if applicable]: <br />Cty/State/Zip: <br />Dublin / CA / 94568 <br />Phone, <br />510-465-0613 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />ROOM <br />1. The information provided on this Certificate of Compliance is true and correct. <br />VAV REHEATED <br />designer). <br />VAV DEADBAND <br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, <br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. <br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement <br />AREA BASIS <br />OCCUPANCY BASIS <br />Responsible Designer Name: <br />MINIMUM <br />Jia Hui Pan <br />Company, <br />JHP Engineering and Design Services, Inc. <br />Date Signed: <br />09-20-2015 <br />SCHEDULES, ETC] <br />Lioense:M35374 <br />City/State/Zip_ <br />Dublin / CA / 94565 <br />Phone: <br />510-465-0613 <br />Demand <br />BASIS <br />Automatic <br />PRIMARY AIR CFM <br />Distributed <br />PRIMARY AIR CFM <br />01 <br />02 <br />03 <br />04 <br />b5 <br />06 <br />07 <br />08 <br />09 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />m <br />3 <br />o <br />Management <br />0 <br />3 <br />w <br />w <br />Unitary <br />a <br />Controls <br />a <br />� <br />o <br />Packaged <br />a <br />a <br />Test Performed By: <br />a <br />a <br />� <br />a� <br />> <br />a <br />>� <br />a� <br />� <br />� <br />a <br />w <br />� <br />z <br />o <br />� <br />o <br />LL <br />�� <br />w <br />� <br />AC Systems <br />System <br />LL <br />1 <br />� <br />� <br />� <br />� <br />� <br />o <br />�I <br />� <br />RTU -02 <br />1 <br />Z <br />y <br />a <br />w <br />CUJ <br />Q <br />� <br />w <br />� <br />w <br />C�z�� <br />C l_7 <br />T Q C <br />�¢ C <br />C_ <br />T Q C <br />O <br />m <br />Q C <br />H <br />J <br />Z (7 <br />Z <br />� <br />J <br />O <br />O <br />O <br />J <br />W Q <br />H H <br />LL LL <br />z� U <br />LL O LL <br />z Z� <br />LL LL <br />Z t7 U <br />J� <br />K LL <br />W U <br />� $ <br />cc <br />G <br />cc <br />LL <br />O <br />K <br />W <br />m <br />C <br />LL <br />W U <br />0c_ <br />�-% <br />C LL <br />� U <br />0c_ <br />U <br />LL <br />K <br />dc <br />O} <br />G <br />G <br />C <br />w <br />wo <br />w � <br />wa <br />z <br />a <br />z <br />z <br />� <br />� <br />� <br />z_ <br />u <br />O <br />¢ <br />u <br />u <br />D O <br />O w <br />D= <br />O <br />z <br />z <br />O <br />� <br />o� <br />� <br />Z <br />p <br />� <br />u <br />z <br />Z <br />� <br />w <br />cn <br />� <br />— <br />z <br />O <br />ri <br />� <br />z <br />¢ <br />m <br />o_ <br />KITCHEN <br />�. <br />560 <br />0.15 <br />84 <br />3 <br />15 <br />45 <br />84 <br />85 <br />PASS. <br />�. <br />STORAGE <br />� <br />253 <br />0.15 <br />39.5 <br />1 <br />15 <br />15 <br />39.5 <br />40 <br />PASS <br />DINING <br />� <br />420 <br />0.5 <br />215 <br />28 <br />15 <br />420 <br />420 <br />420 <br />PASS <br />RTU -01 <br />� <br />18 <br />543.5 <br />545 <br />PASS <br />KITCHEN <br />� <br />784 <br />0.15 <br />117.6 <br />4 <br />15 <br />60 <br />117.6 <br />120 <br />PASS <br />RESTROQpi <br />i <br />� <br />161 <br />0.15 <br />24.2 <br />2 <br />15 <br />30 <br />30 <br />30 <br />PASS <br />DINING <br />282 <br />0.5 <br />14.1 <br />19 <br />15 <br />285 <br />285 <br />285 <br />PASS <br />RTU -02 <br />25 <br />432.6 <br />435 <br />PASS <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. I certify that this Certificate of Compliance documentation is accurate and complete. <br />Documentation Author Name:. <br />Jia Hui Pan <br />Documentation Author Signature: <br />Company, <br />JHP Engineering and Design Services, Inc. <br />Signature Date, <br />09-20-2015 <br />Address 3119 Central Parkway <br />CEA/ HERS Certification Identification [if applicable]: <br />Cty/State/Zip: <br />Dublin / CA / 94568 <br />Phone, <br />510-465-0613 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />I certify the following under penalty of perjury, under the laws of the State of California: <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible <br />designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance <br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, <br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. <br />5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement <br />agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the <br />building owner at occupancy. <br />Responsible Designer Name: <br />Responsible Designer Signature: <br />Jia Hui Pan <br />Company, <br />JHP Engineering and Design Services, Inc. <br />Date Signed: <br />09-20-2015 <br />Address3119 Central Parkway <br />Lioense:M35374 <br />City/State/Zip_ <br />Dublin / CA / 94565 <br />Phone: <br />510-465-0613 <br />A. MECHANICAL COMPLIANCE FORMS 8e WORKSHEETS <br />(indicate if worksheet is included) <br />For detailed instructions on the use of this and all Energy Standards compliance documents, refer to the 2016 Nonresidential Manual <br />Note: The Enforcement Agency may require all compliance documents to 6e incorporated onto the building plans. The NRCC MCH 04 E and NRCC MCH 05 E are alternative <br />compliance documents to NRCC-MCH-01-E, NRCC-MCH-02-E and NRCC-MCH-03-E for projects using only single zone packaged HVACsystems. <br />YES <br />NO <br />Form <br />Title <br />� <br />person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following <br />NRCC-MCH-04-E (1 of 2) <br />Certificate of Compliance. Required on plans when used. <br />The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy. <br />Test Description <br />NRCC-MCH-04-E (2 of 2) <br />Mechanical Acceptance Tests. Required on plans when used. <br />MCH -04-A <br />MCH -05-A <br />NRCC-MCH-05-E (1 of 2) <br />HVAC Prescriptive Requirements. It is required on plans when used. <br />MCH -11-A <br />(: <br />NRCC-MCH-05-E (2 of 2) <br />Mechanical 5WH Equipment Summary is required for all submittals with service water heating, pools or spas. It is <br />required on plans where applicable. <br />Designer: <br />This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to <br />check the applicable boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the <br />equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the <br />test. Since this compliance document will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. <br />Enforcement Agency: <br />Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for <br />normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. <br />Systems Acceptance. Before occupancy permit is granted all newly installed HVAC equipment must be tested using the Acceptance Requirements. The NRCC-MCH-04-E compliance <br />document is not considered a completed document and is not to be accepted b the building department unless the correct boxes are checked. Theequipment re uirin testing, <br />Y g q g g. <br />person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following <br />checked -off forms are required for ALL new! installed and replaced equipment. In addition a Certificate of Acceptance compliance documents shall be submitted to the building <br />Y g <br />department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. <br />The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy. <br />Test Description <br />MCH -02-A <br />MCH -03-A <br />MCH -04-A <br />MCH -05-A <br />MCH -06-A <br />MCH -07-A <br />MCH -11-A <br />MCH -12-A <br />MCH -14-A <br />MCH -18-A <br />Demand <br />Automatic <br />Distributed <br />Ener � <br />Equipment <br />Air <br />FDD for <br /># of <br />Outdoor <br />Single Zone <br />Economizer <br />Control <br />Supply Fan <br />Demand <br />Energy <br />Management <br />Requiring Testing <br />Units <br />Air <br />Unitary <br />Distribution <br />Controls <br />Ventilation <br />VAV <br />Shed <br />Packaged <br />Storage DX <br />Control <br />Test Performed By: <br />or Verification <br />Ducts <br />DX Units <br />(DCV) <br />Control <br />AC Systems <br />System <br />RTU -01 <br />1 <br />� <br />� <br />� <br />� <br />� <br />� <br />�I <br />RTU -02 <br />1 <br />