Laserfiche WebLink
❑ <br />Lu <br />Lu <br />U) <br />Lu <br />ry <br />it <br />J <br />J <br />Q <br />U <br />z <br />U <br />Lu <br />U <br />ryLu <br />U) <br />z <br />cD <br />Lu <br />❑ <br />z <br />Q <br />z <br />ry <br />Lu <br />Lu <br />z <br />cD <br />z <br />Lu <br />ROOF PLUMBING PLAN <br />SCALE: /4" = I-0" <br />N <br />SHEET NOTES: <br />1> KITCHEN MAKE-UP AIR UNIT. SEE MECHANICAL <br />ROOF PLAN FOR DETAIL. PROVIDE BACKFLOW <br />PREVENTION DEVICE, LOCAL SHUT-OFF VALVE, <br />AND FLEXIBLE PIPE CONNECTION TO UNIT. <br />ALSO PROVIDE MIN. 1%2" DRAIN LINE WITH <br />VENT AND TRAP PER PLAN. <br />3/4"0 G. UP FROM BELOW. CONTRACTOR TO <br />FURNISH AND INSTALL NEW GAS SHUT-OFF <br />VALVE WITH FLEXIBLE CONNECTION AT UNIT. <br />3 3/4"0 CW UP FROM ROOF BELOW. <br />4 2%2"0 PLUMBING VENT TERMINATE AT ROOF AT <br />12" ABOVE ROOF, 36" AWAY FROM PARAPET, <br />AND 10' AWAY FROM OSA INTAKE. <br />3"0 PLUMBING VENT TERMINATE AT ROOF AT 12" <br />ABOVE ROOF, 36" AWAY FROM PARAPET, AND <br />10' AWAY FROM OSA INTAKE. <br />1%2"O DRAIN WITH TRAP AND VENT AT MAU-01 <br />DOWN THROUGH ROOF. SEE PB -1.1 FOR <br />CONTINUATION. <br />Q2"O DRAIN DOWN THROUGH ROOF. SEE PB -1.1 <br />FOR CONTINUATION. <br />EJJJ� JJ `JP 11J7rJJJ <br />SJe�rwcJe�s� IrnJcJ <br />ADR: 3119 Central Parkway, <br />Dublin CA. 94568 <br />TEL: 510-788-6029 <br />CEL: 510-468-0613 <br />FAX: 510-788-6039 <br />Revisions I Date <br />PROGRESS REVIEW 10-01-2018 <br />PERMIT SET 10-29-2018 <br />Preliminary Set <br />Design Review Set <br />Plan Check Set X <br />Plan Check Resubmit <br />Construction Set <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />ROOF <br />PLUMBING PLAN <br />of: PB -2.0 <br />�U) <br />LU <br />F--- <br />o <br />ti <br />w <br />o <br />Lo <br />Lu <br />Q <br />O <br />= <br />Q <br />M <br />� <br />? <br />U <br />QZ <br />0 <br />V <br />F- <br />z ° <br />O <br />Q <br />m <br />U <br />w <br />0 <br />00 <br />F_ <br />o <br />cn <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />ROOF <br />PLUMBING PLAN <br />of: PB -2.0 <br />