Laserfiche WebLink
Table of Contents <br /> 1 Introduction.............................................................3 <br /> 2 Listings and approvals............................................3 <br /> 3 Inspection,handling&storage..............................3 <br /> 4 Materials..................................................................4 <br /> Pipe...........................................................................4 <br /> Fittings.......................................................................4 <br /> Adhesive....................................................................4 <br /> Tools..........................................................................4 <br /> 5 Field cutting&tapering primary pipe....................5 <br /> Cutting.......................................................................5 <br /> Removing containment ............................................5 <br /> Tapering with Ameron Taper Maker..........................5 <br /> Tapering with power tapering tools..........................6 <br /> 6 Piping system layout...............................................6 <br /> Trenching, bedding &backfilling...............................6 <br /> Supporting valves, accessories&vent lines.............7 <br /> Precise alignment and make-up...............................8 <br /> Flexible sump penetration fitting installation.............8 <br /> Cross-overs...............................................................9 <br /> 7 Bonding primary systems................ <br /> Joint preparation.......................................................9 <br /> Mixing Ameron adhesive...........................................9 <br /> Applying Ameron adhesive.....................................10 <br /> Making the joint.......................................................10 <br /> Pot life&cure time for Ameron adhesive................10 <br /> Force curing Ameron adhesive...............................11 <br /> Using heat blankets ................................................11 <br /> Connecting to non-Ameron fiberglass piping.........11 <br /> 8 Sealing secondary containment system.............12 <br /> Joint preparation.....................................................12 <br /> Making the joint.......................................................12 <br /> Terminating the secondary containment ................12 <br /> Terminating test reducer.........................................12 <br /> Molded termination assembly.................................12 <br /> 9 NPT threaded connections...................................13 <br /> Thread preparation..................................................13 <br /> Making the joint.......................................................13 <br /> Isolating flex connections at the shear valve..........13 <br /> 10 Repair procedures ................................................14 <br /> Minor damage.........................................................14 <br /> Majordamage ........................................................14 <br /> 11 Primary system testing.........................................14 <br /> Recommended practices........................................14 <br /> 12 Containment system testing................................15 <br /> Pneumatic testing ...................................................15 <br /> Provisions for testing and monitoring.....................15 <br /> 13 Simultaneous testing............................................15 <br /> 14 Health &safety information..................................16 <br /> Toxicity of adhesive................................................16 <br /> Handling precautions for adhesive.........................16 <br /> First aid for adhesive users ....................................16 <br /> Important Notice.....................................................16 <br />