My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> 1 Introduction.............................................................3 <br /> 2 Listings and approvals............................................3 <br /> 3 Inspection,handling&storage..............................3 <br /> 4 Materials..................................................................4 <br /> Pipe...........................................................................4 <br /> Fittings.......................................................................4 <br /> Adhesive....................................................................4 <br /> Tools..........................................................................4 <br /> 5 Field cutting&tapering primary pipe....................5 <br /> Cutting.......................................................................5 <br /> Removing containment ............................................5 <br /> Tapering with Ameron Taper Maker..........................5 <br /> Tapering with power tapering tools..........................6 <br /> 6 Piping system layout...............................................6 <br /> Trenching, bedding &backfilling...............................6 <br /> Supporting valves, accessories&vent lines.............7 <br /> Precise alignment and make-up...............................8 <br /> Flexible sump penetration fitting installation.............8 <br /> Cross-overs...............................................................9 <br /> 7 Bonding primary systems................ <br /> Joint preparation.......................................................9 <br /> Mixing Ameron adhesive...........................................9 <br /> Applying Ameron adhesive.....................................10 <br /> Making the joint.......................................................10 <br /> Pot life&cure time for Ameron adhesive................10 <br /> Force curing Ameron adhesive...............................11 <br /> Using heat blankets ................................................11 <br /> Connecting to non-Ameron fiberglass piping.........11 <br /> 8 Sealing secondary containment system.............12 <br /> Joint preparation.....................................................12 <br /> Making the joint.......................................................12 <br /> Terminating the secondary containment ................12 <br /> Terminating test reducer.........................................12 <br /> Molded termination assembly.................................12 <br /> 9 NPT threaded connections...................................13 <br /> Thread preparation..................................................13 <br /> Making the joint.......................................................13 <br /> Isolating flex connections at the shear valve..........13 <br /> 10 Repair procedures ................................................14 <br /> Minor damage.........................................................14 <br /> Majordamage ........................................................14 <br /> 11 Primary system testing.........................................14 <br /> Recommended practices........................................14 <br /> 12 Containment system testing................................15 <br /> Pneumatic testing ...................................................15 <br /> Provisions for testing and monitoring.....................15 <br /> 13 Simultaneous testing............................................15 <br /> 14 Health &safety information..................................16 <br /> Toxicity of adhesive................................................16 <br /> Handling precautions for adhesive.........................16 <br /> First aid for adhesive users ....................................16 <br /> Important Notice.....................................................16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.