My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Introduction Dualoy 3000/LCX primary pipe and fittings are manufactured from thermosetting epoxy <br /> resins reinforced with high tensile strength fiberglass filaments.The pipe is produced by <br /> filament winding.The pipe incorporates a resin-rich inner liner that is resilient and <br /> holiday-free and a resin-rich outer coating that protects the structural wall from UV <br /> degradation during storage and installation.The structural wall strength of <br /> Dualoy 3000/LCX pipe is unsurpassed in the fiberglass pipe industry.Primary fittings are <br /> manufactured by filament-winding or compression molding. <br /> Dualoy 3000/LCX pipe and fittings are electrically non-conductive and never require <br /> cathodic protection or sacrificial anodes.Installed systems are immune to external <br /> corrosion from stray-current electrolysis and cathodic interference.They are unaffected <br /> by alkaline or acidic soil conditions. <br /> The primary pipe and fittings are joined using the same strong,reliable bonded joint as in <br /> Dualoy 3000/L single wall piping. <br /> The primary and containment piping systems are completely separated,making this a <br /> true coaxial system.The space between the primary and containment pipe is controlled <br /> by an even layer of graded sand.Precise dimensions are maintained as is a free-flowing <br /> interstitial space. <br /> The containment connection between the pipe and fittings is made by a fast,effective <br /> mechanical seal with elastomeric gaskets. <br /> Dualoy 3000/L single-wall piping systems <br /> Detailed installation instructions for Dualoy 3000/L single-wall piping may be found in <br /> Ameron Bulletin 7501 (FP104)available from Ameron Fiberglass Pipe Group or your <br /> Ameron distributor. <br /> 2 Listings and Dualoy 3000/LCX is Listed in the United States with Underwriters Laboratories for <br /> approvals nonmetallic underground piping for petroleum products,alcohols and alcohol-gasoline <br /> mixtures(File MH9162).Dualoy 3000/LCX pipe&fittings are also listed with Underwriters <br /> ULp Underwriters Laboratories of Canada for Petroleum Products and Oxygenated Fuels(File CMH715). <br /> 11r/ laboratories Inca <br /> 3 Inspection, handling Inspection <br /> and storage Careful inspection of the outer(secondary)layer of pipe is especially important on coaxial <br /> containment installations.Since damage to the primary is not visible once the pipe is <br /> installed,it is essential to check the outer pipe jacket for damage.Testing has shown that no <br /> damage will occur to the primary pipe without an indication of damage on the outer jacket. <br /> Upon receipt at the job site,inspect the pipe fully.Locate,cut out,repair or replace <br /> damaged pipe.Impact damage is usually recognizable as rounded pale areas just under <br /> the surface or as deep gouges,scratches or cracks.Remove end protectors to inspect <br /> tapers for damage and then replace protectors.Inspect grooves and threads on fitting <br /> assemblies for damage.If threads are badly damaged or grooves are affected,discard <br /> and replace with a new part. <br /> Handling <br /> Dualoy 3000/LCX has the higher impact resistance than single-wall pipe,however, <br /> fiberglass pipe is susceptible to damage if handled improperly.Adhere to the following <br /> recommendations when handling: <br /> • Do not transport pipe without proper protection against impact. <br /> • Truck pipe racks should be padded with carpeting or like material to prevent damage. <br /> • Tie the pipe down during transport to prevent it from bouncing on the racks. <br /> • Do not use chains to tie down the pipe on a truck:Use nylon straps or hemp rope. <br /> • Do not drop the pipe from truck bed when stringing:Lay the pipe down by hand. <br /> • Pipe loads that are properly separated and supported can be unloaded by padded forklifts. <br /> Storage <br /> Dualoy 3000/LCX pipe incorporates a 5-mil thick,resin-rich reinforced outer coating <br /> which provides outstanding UV resistance.Pipe stored out-of-doors for extended <br /> periods may assume a chalky appearance.However,this change in appearance is <br /> superficial and does not affect the pipe's performance.Protect stored pipe from <br /> impact damage by stacking on padded racks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.