My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 Field cutting and Tapering with power tapering tools <br /> tapering primary pipe Pipe is most often tapered using one of several power tapering tools.Manufacturers' <br /> (cont'd.) names and addresses may be obtained from Ameron distributors.Pipe tapered with <br /> these tools should be periodically checked against a factory taper for taper length and <br /> taper angle. <br /> On 2"pipe,it may be possible to simultaneously remove the containment jacket and <br /> taper the primary pipe in one step with some power tapering tools.Consult Ameron <br /> engineering department for information. <br /> Observe the following procedures when <br /> operating the Taper Maker. Taper lengths <br /> • Check blade angle by using a factory Nominal Taper Containment <br /> taper as a guide.When properly adjusted, Pipe Size Length Removed <br /> the blade should be in contact with the (in) (mm) (in) (mm) min.(in..mm� <br /> taper over the entire taper length. If 250 1y2 38 2334 70 <br /> adjustment is required,loosen the blade a 80 13/4 44 3%2 ss <br /> retaining screws and adjust the blade 100 lye 48 <br /> angle with the set screw. <br /> Fig.5-3.Dualoy 3000/LCX can be Mark the required taper length on the pipe.Refer to the taper length table below. <br /> tapered using the Ameron Taper 0 Insert the threaded collet shaft through the base casting and the mandrel. <br /> Maker.The ratchet handle makes the <br /> Taper Maker convenient to use in 0Select the appropriate size collet and slide it onto the mandrel,making sure the <br /> confined spaces when repairing key inside the collet engages the slot of the mandrel. <br /> existing lines. 0 Hold the collet and turn the collet control knob clockwise until the collet begins to <br /> expand.Note that it may be necessary to adjust the cutting head to accommodate <br /> different size collets. <br /> • Insert the collet into the pipe until the back end is flush with the end of the pipe. <br /> _ Expand the collet to grip the inside of the pipe by turning the collet control knob <br /> clockwise. <br /> r Lower the cutting blade until it contacts the pipe by turning the cutting head <br /> �1 adjustment handle clockwise. <br /> • Using the ratchet handle,turn the tool clockwise,gradually lowering the cutting <br /> ' blade by turning the cutting head adjustment handle clockwise.Continue until a <br /> smooth taper of the proper length is obtained.The thin edge of the completed <br /> taper should be no less than'/32 inch(0.75 mm)thick. <br /> Fig.5-4.Pipe is typically tapered using For complete operating information,refer to the appropriate Taper Maker Product <br /> one ofseveralpower tapering tools Data/OperatingInstructions. <br /> available from outside sources. <br /> 6 Piping system layout Trenching,bedding and backfilling <br /> The smaller outside diameter of the Dualoy 3000/LCX coaxial pipe will save on trenching <br /> and backfilling costs.The availability of factory Jump-Over fittings also helps reduce the <br /> depth of excavation needed to maintain trench slope.Although fiberglass pipe has <br /> excellent strength,it must be protected against impact which may occur from improper <br /> handling or during backfilling. <br /> • Provide a trench width equal to the pipe diameter plus six inches on each side. <br /> Separate multiple lines by at least 4 inches.Refer to Fig.6-2. <br /> • Provide a minimum of 18 inches of select backfill between the top of the pipe and <br /> unpaved ground surfaces. <br /> • Provide a minimum of 4 inches of select backfill between the top of the pipe and <br /> reinforced concrete pavement(4 inches minimum thickness). <br /> • Provide a minimum of 8 inches of select backfill between the top of the pipe and <br /> asphalt pavement(2 inches minimum thickness). <br /> • Slope the trench bottom evenly from the dispensers back to sumps or tanks at a <br /> minimum slope of/e in/ft. <br /> • The trench bottom must be free of hard or sharp objects. <br /> O <br />
The URL can be used to link to this page
Your browser does not support the video tag.