My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Piping system layout • Grade the trench bottom with at least 6 inches of select backfill to provide firm, <br /> (cont'd.) even support for the pipe.Compact the subgrade well to prevent differential <br /> settling. <br /> • Protect the pipe from impact during backfilling and abrasion during operation by <br /> surrounding it with four to six inches of select backfill such as washed sand,pea <br /> gravel(3/4-inch maximum)or crushed stone(1/2-inch maximum). <br /> • Wrap pipe lying near concrete with rubber or foam padding to avoid direct contact <br />( with the concrete. <br /> a <br /> None p <br /> Asphalt <br /> 2(min) <br /> Concrete - <br /> 4(min) <br /> - - 16(min) <br /> Fig.6-1.During layout,bonding and S min <br /> inspection,support the piping on ( ) <br /> 2x4"batter boards"to keep the <br /> joints clean and to keep bedding <br /> out of the pipe. <br /> 4(min) <br /> Fig.6-2.Use only select materials for Select backfill - 6(min) <br /> bedding and backfilling Dualoy <br /> 3000/LCX fuel handling systems.Native <br /> materials are rarely suitable and should Native a(min) 6(min) <br /> not be used. soil <br /> Supporting valves,accessories and vent lines <br /> Do not use fiberglass pipe to support the weight of heavy items in a line such as valves, <br /> strainers and steel vent riser pipes.Provide separate supports for valves and <br /> accessories. <br /> 0 <br /> Permanent <br /> structure <br /> O <br /> Fig.6-3.Support risers by attaching <br /> them directly to structure walls. <br /> Steel pipe clamp <br /> Steel nipple <br /> / Steel <br /> Steel riser .L coupling <br /> I Bell x male <br /> Steel elbow adapter <br /> Dualoy3000/L fiberglass pipe �> <br /> O <br />
The URL can be used to link to this page
Your browser does not support the video tag.