Laserfiche WebLink
8 Sealing secondary Joint preparation <br /> containment system Inspect all sealing surfaces to insure they are free of any foreign material such as dirt, <br /> sand,or adhesive.Inspect all sealing surfaces to insure there are no cuts,scratches,or <br /> nicks which could prevent the joint from sealing properly. <br /> Making the joint <br /> Thoroughly lubricate the large O-ring and sealing surfaces with a medium viscosity motor <br /> oil and insert it into the female groove on the end of the Dualoy 3000/LCX fitting.Hand <br /> �p tighten the threaded closure into the fitting,compressing the O-ring.Tighten the closure <br /> large 0-ring with an LCX Closure Spanner Wrench to 40 foot pounds,60 foot pounds,or eighty foot <br /> pounds for 2-inch,3-inch or 4-inch respectively.Spanner wrenches include a 12"square <br /> hole so a torque wrench can be used to tighten the threaded closure.Do not over-torque <br /> as this may cause the threads to skip.Re-tighten to lower torque if this occurs. <br /> Liberally lubricate the small O-ring and the sealing surfaces with motor oil.Do not <br /> lubricate the threads.Slide the O-ring up to the sealing area.Hand-tighten the nut and <br /> then tighten with Nut Spanner Wrench to 40,60,or 80 foot pounds for 2-,3-,or 4-inch <br /> threaded closure Fig.8-1. systems respectively.(Closure may turn slightly during this step.) <br /> Assembly <br /> sequence to Once assembled the system can be tested immediately. <br /> seal the <br /> containmentof 2"LCX coupling sleeve Dualoy 3000/L sleeve coupling <br /> the / <br /> Dualoy /•`/ <br /> A" 3000/LCX <br /> j� fitting. <br /> nut <br /> Fig.8-2.2"Dualoy 3000/LCX <br /> coupling sleeve <br /> LCX pipe nut small O-ring <br /> Note:Molded secondary couplings and termination assemblies should be tightened using two <br /> Installation tip: spanner wrenches at the same time.Tighten using the wrenches from each end. <br /> When installing a 2-inch Dualoy <br /> 3000/LCX coupling sleeve make marks Terminating the secondary containment <br /> on the containmentpipe about 7inches When the containment needs to be terminated within a sump,use either a flexible <br /> on each side of the approximate center terminating sleeve or a molded termination sleeve. <br /> of the Dualoy 3000/L sleeve coupling. <br /> When the Dualoy 3000/LCX coupling •Flexible terminating sleeve <br /> sleeve is properly installed,it will be Position the terminating sleeve over the end of the containment so that one hose clamp <br /> centered between these marks. will tighten on primary pipe and one clamp will tighten on the containment.Tighten hose <br /> clamps until a good seal is ensured. <br /> *Molded termination sleeve <br /> Position the termination sleeve over the containment end.Note that the O-seal which <br /> seals against the primary piping has a larger cross section than the other O-ring.Lightly <br /> lubricate the O-ring with motor oil.Do not lubricate the threads.Lubricant on the threads <br /> can prevent properjoint make-up by allowing threads to skip.Tighten each end <br /> separately to 40 ft.Ib.with an LCX spanner wrench.Each termination fitting can be <br /> supplied with a Schrader valve to test the system or to provide jumpover around primary <br /> fittings in sumps.One sleeve(min.)with test valve must be used in each line or section of <br /> line for testing purposes. <br /> optional test valve <br /> Fig.8-3.Dualoy3000/LCX molded 0-seal small O-ring <br /> termination assembly to seal off LCX nut <br /> secondary containment. <br /> 2"available with or without test valve.3 <br /> and 4"are available only with test port. F, <br /> LCX termination sleeve LCX pipe <br />