Laserfiche WebLink
13Simultaneous Procedure: <br /> testing (cont'd.) •Join all connections of the primary system.An optional pressure test may be performed <br /> once this step is completed to assure integrity of the line while connections are visible. <br /> Example: •Complete closure of the containment system. <br /> Primary is pressurized to 50 psi; •Connect pressure gauges to each portion(primary and containment)of the system.These <br /> containment to 30 psi. The differ- gauges should have full-scale readings no greater than two times the test pressure or to the <br /> ential of 20 psi is enough to detect higher pressure of either system,whichever is greater. <br /> any communication between the .Pressurize the primary system to its intended test pressure and close off the source to <br /> two lines.Should pressure change, check for pressure drops.Allow the system to stabilize should temperature changes be <br /> either or both systems may need to occurring which can affect the gauge pressure. <br /> be inspected and made tight.In this <br /> example,pressure increase in the •Pressurize the containment system to a different pressure than that of the primary.Allow <br /> secondary indicates a leak in the this system to stabilize also. Note:Temperature sensitivity of the containment will be <br /> primary.Pressure decrease in the greater than the primary since it is exposed to the outside environment.Despite intuition to <br /> secondary indicates a leak in the the contrary,pressure changes for a given temperature change will not be different for the <br /> secondary.A pressure change in low volume containment compared to the higher volume primary.It is,however,potentially <br /> both systems in the same direction subject to greater temperature fluctuations. <br /> indicates a temperature induced •Maintain slight pressure(5 to 10 psi)on both systems until the construction is completed to <br /> pressure change. signal any damage which may be caused by pavement stakes,excavation equipment or <br /> other causes.Should the pressure drop in the containment during this time,re-pressurize <br /> and check integrity before other steps are taken.Movement of the piping during backfilling <br /> may cause the system to burp slightly.The seal of the O-ring gasket will be regained when <br /> the movement stops.The system can be re-pressurized without concern. <br /> 14 Health and safety Toxicity of adhesive <br /> information Hardener:Irritating to the skin,eyes and respiratory tract:toxic orally;may cause sensitization. <br /> Resin:May be mildly irritating to skin and eyes;may cause sensitization. <br /> rNFOR CHEMICAL EMERGENCY Handling precautions for adhesive <br /> SPILL,LEAK,FIRE,EXPOSURE I Hardener:Do not get in eyes,on skin or clothing.Avoid breathing vapor.Wash thoroughly after handling.When <br /> OR ACCIDENT handling in the field,wear gloves and eye protection.When handling in bulk quantities,wear rubber gloves, <br /> CALL CHEMTREC-DAY rubber apron and NIOSH approved respirator. <br /> OR NIGHT I Resin:Avoid contact with eyes,skin or clothing.When handling in the field,wear gloves and eye protection. <br /> Wash thoroughly after handling. <br /> 1-800-424-9300 First aid for adhesive users <br /> Toll-free in the continental U.S. I In case of contact <br /> 483-7616 in District of Eyes:Immediately flush with plenty of water for at least 15 minutes.Call a physician. <br /> Columbia I Skin:Wash with water and soap if available. <br /> For calls originating outside the I Clothing:Remove contaminated clothing and wash before reuse. <br /> continental U.S. <br /> 202-483-7616-Washington D.C. Inhalation:Remove to fresh air.Give oxygen or artificial respiration if necessary. <br /> collect I Ingestion:If hardener is swallowed and person is conscious,give plenty of water or milk to drink.Do not induce <br /> ALL CALLS ARE RECORDED vomiting.Call a physician.If resin is swallowed,give 100 grams(about Y<Ib)of activated charcoal slurry in water. <br /> Do not induce vomiting.Call a physician. <br /> Important Notice This literature and the information and recommendations it contains are based on data reasonably believed to be <br /> reliable.However,such factors as variations in environment,application or installation,changes in operating <br /> procedures,or extrapolation of data may cause different results.Ameron makes no representation or warranty, <br /> express or implied,including warranties of merchantability or fitness for purpose,as to the accuracy,adequacy or <br /> completeness of the recommendations or information contained herein.Ameron assumes no liability whatsoever <br /> in connection with this literature or the information or recommendations it contains.Product specifications are <br /> subject to change. <br /> At <br /> AMERON GROUP HEADQUARTERS <br /> INTERNATIONAL P.O.Box 801148•Houston,TX 77280•Tel:(713)690-7777•Fax:(713)690-2842•http://www.ameron.com <br /> FIBERGLASS PIPE GROUP <br /> Fiberglass Pipe Division Fiberglass Pipe Division Fiher�lass Pipe Division Ameron Composites Fiberglass Pipe Division <br /> Asia Europe Americas P.O.Box 71370 Centron International <br /> Ameron(Pte)Ltd. Ameron B.V. P.O.Box 878 11 McBride Street P.O.Box 490 <br /> No.7A,Tuas Avenue 3 J.F.Kennedylaan 7 Burkburnett,TX 76354 Newnan,Georgia 30263 600 FM 1195 South <br /> Singapore 639407 4191 MZ Geldermalsen Tel: (940)569-1471 Tel: (770)253-2000 Mineral Wells,Texas 76068 <br /> Tel: 65 8616118 The Netherlands Fax: (940)569-2764 Fax: (770)253-9234 Tel: (940)325-1341 <br /> Fax: 65 862 1302/8617834 Tel: +31345 587 587 Fax: (940)325-9681 <br /> Fax: +31345 587 561 <br /> Telex: 40257 bonds III <br /> ©1997 Ameron•Printed In U.S.A.•FP738D(9199)supercedes FP738C(12/98)•5MI1241 <br />