My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 Primary system Conversely,overnight decreases in pressure due to cooling from afternoon to <br /> testing (cont'd) early morning are normal and do not necessarily indicate a leak. <br /> • After testing,maintain 5 to 10 psi(35 to 70 kPa)in the system during subsequent <br /> construction so that damage caused by stakes,excavation equipment,etc,.can <br /> be detected and corrected before pavement is installed or product is pumped. <br /> 12Containment Pneumatic testing <br /> system testing Plan tests carefully and carry them out with all due precautions.Pressurizing equipment <br /> should be suited to the size of the system and the pressure required and should be <br /> operated by qualified and experienced personnel only.Pressure sources should be <br /> capable of approaching test pressure gradually. <br /> Use gauges with a full-scale reading of no more than twice the test pressure.Do not use <br /> a 100 psi gauge for a 10 psi test.Use reliable gauges calibrated against a dead weight <br /> tester zeroed for atmospheric pressure. <br /> The volume of air in the interstitial space is very small,so use of a regulator is <br /> recommended to control the pressure during filling of the line. <br /> Pneumatic testing at approximately 30 psi is recommended and is the preferred method <br /> of testing containment piping.If flexible terminating sleeves are used,the test pressure <br /> is limited to 5-10 psi.The molded terminating assembly must be used for all tests over <br /> 10 psi. <br /> Provisions for testing and monitoring <br /> The terminating sleeves with test valve are equipped with a''/o inch Schrader valve which <br /> can be used to attach pressurizing equipment.It may be necessary to remove the <br /> internal valve priorto attaching pressurization equipment.Use proper tool to do so. <br /> Important. <br /> Before checking the system for integrity,allow 10 to 20 minutes for the pressure to <br /> stabilize.Do not adjust fittings while system is under pressure.If a loss of pressure is <br /> indicated,disassemble the mechanical connection,remove the O-rings and inspect for <br /> foreign material or damage to the O-ring.If the sealing surfaces are clean,relubricate <br /> the O-rings and reinstall. <br /> Should gauge readings fail to remain stable and the testing is being done pneumati- <br /> cally,use a soap solution to locate leakage. <br /> 13 Simultaneous Simultaneous testing of the primary and containment systems <br /> testing <br /> Testing of the primary and containment portions of Dualoy 3000/LCX can be done simulta- <br /> neously.This procedure is possible because the small volume of the interstitial space in the <br /> containment is very sensitive to air volume changes.Large changes in pressure will occur <br /> when small amounts of air are gained or lost.The advantages of this this procedure are: <br /> •reduces the time needed to inspect the system(done in one visit by the inspector). <br /> •the system can be pressurized prior to the inspection,eliminating a rush to get the system <br /> closed before the inspector visit is scheduled. <br /> •improved safety. <br /> Pressure testing of the two systems is done at two different pressures.Normal practices are <br /> to test the primary pipe at a higher pressure than the containment.As before,Ameron <br /> advises that pressure testing with compressed air can be hazardous and precautions should <br /> be taken to minimize the pressure used and the potential damage which could occur should <br /> a sudden failure occur.The simultaneous testing of the Dualoy 3000/LCX product actually <br /> enhances the safety aspects of the testing due to its low volume(reducing the potential <br /> energy stored at a given pressure)and the fact that both the primary and containment joints <br /> can be assembled prior to testing(failure of both joints at the same connection would have to <br /> happen to allow significant pipe movement). <br />
The URL can be used to link to this page
Your browser does not support the video tag.