Laserfiche WebLink
MVP PETR' EUM ENGINEERIN(*NC.ACALIFORNIA CORPORATION <br /> , �r <br /> August 21, 2003 ^C 'l�+rr ^��"t• HEAT )f� <br /> �rRtri�F <br /> 03 AtfG 2 f p�12. <br /> Ms. Dina Abate 06 <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue <br /> Stockton, CA 95202 <br /> Re: 2185 East Fremont Street <br /> Dear Ms. Abate: <br /> Michelle has indicated to me you are the person to contact for the fueling system installation at 2185 E. <br /> Fremont Street. <br /> The purpose of this letter is to notify you of our understanding of the changes needed to try to satisfy the <br /> latest installation requirements. <br /> The following items were identified by Michelle: <br /> 1. The top under dispenser containment pans will terminate above concrete level. In fact, they will <br /> protrude about one inch above the concrete level. <br /> 2. All used and unused bungs will be inside sumps. <br /> 3. Piping sumps will be fiber glassed at the tank collar connection as well as at the reducer section. We <br /> will install the TotalTite sump lids and the sump lids will be just under the surface of the finished grade <br /> concrete. <br /> hope I have been clear with these. If not, please call me @ 916-205-1537. <br /> 1 would like to set the tank at 10:00 am, Friday, August 29. <br /> Thank you for your help with this. <br /> Sincerely, <br /> ,)/ ) (�` d; - <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br /> mvpeng@att.net■ PO Boa 281 Folsom, CA 95763-0281■ Phone(916)984-1537■ Fax(916)984-1117■ Cellular(916)205-1537 <br />