My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTHIDEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K Aeran,R.E.H.S. 304 East Weber Avenue, Third Floor <br /> Carl Borgman,R.E.H.S. <br /> Director <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • .. <br /> 4�iko"a�� Program Manager Douglas W.Wilson,R.E.H.S <br /> . <br /> Laurie A.Cotulta,R.E.H.S. Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> April 30, 2003 <br /> MVP Engineering <br /> Attn: Mark Vendeiro <br /> P.O. Box 281 <br /> Folsom, CA 95763 <br /> RE: Fremont Shell <br /> 2185 E. Fremont Street, Stockton <br /> An extension to your permit to install a new underground storage tank system at the <br /> above referenced site has been granted with the following conditions: <br /> 1. All conditions as fore-mentioned in the approval letter dated July 29, 2002 apply. <br /> 2. If the underground storage tank and associated piping are not installed by July 1, <br /> 2003 then the new monitoring system requirements under Assembly Bill 2481 <br /> must be satisfied. An addendum to this permit must be submitted and approval <br /> must be received prior to commencing work. <br /> 3. All portions of the underground storage tank system including piping must be <br /> installed in accordance to the manufacturer's guidelines. <br /> 4. This permit extension expires December 31, 2003. <br /> If you have any questions please contact Dennis Catanyag,REHS at (209) 468-3459. <br /> Thank you, <br /> Dennis H. <br /> Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.