Laserfiche WebLink
02/26/2003 15:21 _,_1.6984'" " 7 MVP PETROLEUM F" PAGE 03 <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUN'T'Y uX*sXPWVbM <br /> Donse K.Heran,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor Carl Borgrnan,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> .•;t.• g :Manager Doua1W W.Wilson, <br /> R.lr.Fi.$- <br /> Proram <br /> Lawrie carica,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> M on,RE.H.S <br /> Program Manager Fax: (209) 464-0138 Mwk Buarcedlo <br /> R.E.H.S. <br /> July 29,2002 <br /> MVP Petroleum <br /> PO Box 281 <br /> Folsom CA 95763 <br /> RE: 2185 E. Fremont, Stockton <br /> Your Application for permit to install a new underground storage tank system at the above location <br /> has been approved with the following conditions: <br /> 1. Contact the fire department and the California Air Resource Board for applicable permits. <br /> 2. Any changes shall be submitted to EHD for approval prior to commencing work. All new <br /> submittals supercede the previous ones. <br /> 3. Both primary and secondary pipes shall bear a UL label. <br /> 4. All pipe fittings and connections shall bear a UL label. <br /> 5. All monitoring systems shall be listed on the LG 113-16. <br /> 6. All testing shall be in compliance with manufacturer's instruction, section 2635 and section <br /> 2636 of California Code of Regulations (CCR) <br /> 7. Automatic pump shutdown must satisfy CCR 2636(8). <br /> 8. All piping must slope to a containment sump with an audible/visual alarm. <br /> 9. All vapor recovery risers shall be equipped with a ball float valve set at 90% for overfill <br /> protection and all tanks shall have an automatic tank gauge which will alert the transfer operator <br /> when the tank is filled to no more than 95%capacity. <br /> 10. A holiday test is to be performed prior to installation per the permit application. <br /> 11. See blue print plans for any additional changes. <br /> 12. Submit employee training certification from the manufacture of the tank and piping prior to <br /> commencing installation. <br /> 13. if any changes are made, an accurate and drawn-to scale-as-built plan must be submitted to <br /> EHD prior to scheduling a final inspection. <br /> 14. Contact Michellc Sterni Le, REHS for inspections. See inspection checklist for the required <br /> inspections. All appointments must be scheduled 48 hours in advance. <br /> 15. This permit expires at the end of the calendar year. <br /> If you have further questions please contact me at(209)468-9847. <br /> Thank you, <br /> t'k' � <br /> Michelle Sterni Le, REHS <br /> Registered Environmcntal Health Specialist <br /> G�� <br />