Laserfiche WebLink
02/26/2003 15:21 91698 MVP PETROLEUM F" PAGE 02 <br /> ENVIRONMENTAL MENTAL HEALTH DEPARTMENT <br /> ' u'"� SAN JOAQUIN COUNTY <br /> �. cAG Urt&SxpervFsors <br /> Donna K.Heran,R..I_.U.S. Carl Bor R.E.H.S. <br /> Director- <br /> a, ,� 304 East Weber Avenue, Third Floor Sn� <br /> Al Olsen,R.E.H.N, Stockton, California 95202-2708 DouMikeglas las W.Wilson, <br /> s.,R.D.I. <br /> • ;:, Douglas W.Wilson,R.E.Ii.5. <br /> Program Yanage7 Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E H.S. ot RobMcClellon,KE.H.S. <br /> Program Manage Fax: (209) 464 0138 Mark BarceMs,R.E.H.S, <br /> October 25, 2002 <br /> MVP Petroleum ' <br /> PO Box 281 <br /> Folsom CA 95763-0281 <br /> RE: Parkwood Beacon <br /> 1612 Hammer Lane, Stockton <br /> The permit to install new piping at the above referenced location is approved with the following <br /> conditions: <br /> 1. Contact the fire department and San Joaquin Valley Air Pollution Control District for <br /> applicable permits. <br /> 2. A third party certified tank integrity test must be performed and results received prior to <br /> scheduling the final inspection if concrete is broken near the underground storage tank. <br /> 3. A third party certified piping line tightness test must be performed and results prior to <br /> scheduling the final inspection. <br /> 4. If automatic pump shut down is provided it must satisfy all conditions listed in section 2636(8) <br /> of California Code of Regulations (CCR). <br /> 5. All piping and connections shall bear a UL label. <br /> 6. All piping must slope to a containment sump with an audible and visual alarm. <br /> 7. All equipment in contact with backfill must have corrosion protection. <br /> 8. Overfill prevention must satisfy CCR 2635(b)(2). <br /> 9. Contact EHD for the following inspections: <br /> a. Primary piping <br /> b. Secondary piping <br /> c. 24 hour lake test on dispenser pans <br /> d. Final inspection <br /> 10. Any changes in information or scope of work must be submitted to EHD prior to <br /> commencing work. <br /> 11. A final inspection must be performed prior to this returning this station to operation. <br /> 12. Submit an As-Built plan. to EHD at the time of the final inspection. Note: A final inspection <br /> will not be performed unless the as-builts are submitted. <br /> 13. Permit expires December 31, 2002, Note: If an extension to the expiration date is required a <br /> request must be received in writing to this office prior to the expiration date. <br /> Contact Ray von Flue, FHS at 1209) 468-9848 for all inspection appointments. <br /> Thank you, <br /> ichelle Sterni Le <br /> Registered Environmental Health Specialist <br />