Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. Detail of tank,associated piping, excavation and cover. <br /> 7. Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b)&2635] <br /> g, Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices,etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code, Division 20, Chapter <br /> 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# <br /> # # Z- # ' # # <br /> CAPACITY <br /> [ Z Cc:C CA-4- <br /> MANUFACTURER <br /> Az MANUFACTURER r7Wn,?n,," �jT�EG L <br /> y ✓, <br /> COMPOSITION E' <br /> MODEL <br /> PRODUCT <br /> CORROSION <br /> PROTECTION <br /> U.L.LISTED <br /> COMPATIBILITY <br /> WITH 100% <br /> METHANOL <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> y� (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1)(1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />