Laserfiche WebLink
There shall be no mixing of backfill materials within the <br /> installation. <br /> EXCAVATION Finished grade <br /> Always follow OSHA guidelines for safety when dealing with <br /> tank excavations. <br /> typically a to 4 ft.'.:.:.:.:::::::.•. :::.: <br /> The excavation should provide adequate room for tanks, piping <br /> and associated equipment used for placement and compaction of <br /> backfill materials. <br /> The slope of excavation wall is determined by OSHA and soil <br /> conditions. Take appropriate action to make your excavation a ♦ 12'. <br /> "safe place"to work. <br /> 1 V. <br /> The excavation shall be free of any sharp, hard objects that `.::`'' : Special <br /> might damage the exterior coating of the tank. Special care placement and <br /> shall be taken not to allow foreign matter to be introduced into compaction required <br /> the tank excavation. <br /> Never place tanks directly on timbers, concrete pad, wooden or <br /> cement cradles or beams of any sort. <br /> Failure to achieve and maintain 85% compaction density <br /> For proper tank support from backfill, adequate room shall be throughout the excavation will void warranty of the storage <br /> left for workers to place and compact backfill material under the <br /> bottom 120 degrees of each tank. <br /> If tanks are anchored mechanically, additional clearance <br /> between tanks and excavation wall may be required. <br /> The bottom of the excavation shall be suitably graded and <br /> leveled. The foundation for each tank shall be a minimum layer <br /> of one of the following: °°f, :' ;'''• <br /> a. 12 inches of clean inert compacted sand, r _=; <br /> b. 12 inches of rounded pea gravel ;>Y : <br /> c. 12 inches of gravel crushings. r';::;?=;SG,':?>' <br /> If a concrete pad is used, the same depth of bedding ,`% .'_ <br /> requirements apply. <br /> There shall be a minimum clearance of 12 inches from the =``~ <br /> outside edge of the tank to the inside edge of the excavation <br /> wall. This distance shall remain true for the entire perimeter <br /> surrounding the tank. <br /> Multiple tank installation also require a minimum of 12 inches With the use of mechanical compactors, care must be exercised <br /> between tank measured from each outside edge. not to damage tank or its corrosion protection coating. <br /> For proper support and the prevention of movement of tank, Note: Do not mix different backfill materials within the <br /> bedding and backfill require adequate compaction. excavation. <br /> If sand is used as bedding and backfill material, an 85% Special Note: Maximum burial depth from top of tank to top <br /> compaction density must be maintained. Compaction density of grade is 5'-0". Consult"Modern subsidiary" if deeper burial <br /> applies to the bedding, backfill around the tank and backfill depths are required. <br /> material covering tank to grade. Sand should be compacted in TANK DEFLECTION <br /> 8" to 12" lifts to attain a 85% Standard Proctor Density. <br /> Moisture is an important ingredient in attaining compaction. For tank's warranty to be implemented, inside vertical tank <br /> Use ASTM-D-698 to determine the maximum dry density and deflection measurements must be taken and documented on <br /> optimum moisture content of the material. Modern's Installation Checklist. Measurements of the tank's <br /> inside diameter shall be taken. Use an opening located closest <br /> Pea gravel and crushed rock are relatively self compacting, to the tank's center for this measurement. Measurements are <br /> however, to prevent voids under tank bottom, all bedding and required before backfilling and again at completion of the <br /> backfill materials must be forced under the lower 120 degree backfilling process to final grade. <br /> section of the tank bottom. <br />